Research on Risk Management Organization of Subway Construction Project Based on Social Network Analysis

被引:0
作者
Yuan, Chao [1 ]
机构
[1] Tianjin Univ Technol, Tianjin 300384, Peoples R China
来源
PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT, EDUCATION, HUMANITIES AND SOCIAL SCIENCES (EMEHSS 2018) | 2018年 / 151卷
关键词
Social Network Analysis; Subway Construction Project; Risk Management Organization;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
This article introduces the social network analysis method to analyze the risk management organization of subway construction project. From the two aspects of the whole network and the individual network, this paper analyzes the network density and centrality of the social network structure of subway construction project to clarify the overall structure of the risk management organization and the role of each participating party. The study found that the overall structure of the risk management organization in the subway construction project is not close enough. The rights and resources in the network are concentrated in a few participants such as the owner, the contractor and the insurance broker, while the remaining organizations have limited influence on risk management. According to the result of social network analysis, this paper puts forward the optimization suggestion of risk management organization.
引用
收藏
页码:464 / 468
页数:5
相关论文
共 8 条
[1]  
[丁荣贵 Ding Ronggui], 2010, [中国软科学, China Soft Science], P132
[2]  
Fan Linjun, 2010, RES NETWORK MODELING
[3]  
Le Yun, 2010, BUILDING EC, P31
[4]  
Liang Ninghui, 2008, J CHONGQING JIANZHU, P81
[5]  
Liu Xingzhi, 2011, RES SOCIAL NETWORK R
[6]  
Liu Zhiyuan, 2017, SHANGHAI INSURANCE, P62
[7]  
Mao Ru, 2007, TUNNEL CONSTRUCTION, p[6, 11]
[8]   Do formal contracts and relational governance function as substitutes or complements? [J].
Poppo, L ;
Zenger, T .
STRATEGIC MANAGEMENT JOURNAL, 2002, 23 (08) :707-725