Production flows scheduling subject to fuzzy processing time constraints

被引:32
作者
Bocewicz, Grzegorz [1 ]
Nielsen, Izabela Ewa [2 ]
Banaszak, Zbigniew Antoni [3 ]
机构
[1] Koszalin Univ Technol, Dept Elect & Comp Sci, Koszalin, Poland
[2] Aalborg Univ, Dept Mech & Mfg Engn, Aalborg, Denmark
[3] Warsaw Univ Technol, Dept Business Informat, Warsaw, Poland
关键词
production flow scheduling; fleet of AGVs; declarative modelling; fuzzy constraint satisfaction problem; cyclic scheduling; AUTOMATED GUIDED VEHICLES; DEADLOCK-AVOIDANCE; MANUFACTURING SYSTEMS; MAINTENANCE; ALGORITHM; PARTS;
D O I
10.1080/0951192X.2016.1145739
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Effective sequencing and scheduling of material handling systems (MHSs) have a major impact on the productivity of a manufacturing system. Since the main function of a MHS is to supply the right materials at the right locations at the right time, the design of automated guided vehicles (AGVs) fleet-oriented, distributed and scalability-robust control policies ensuring deadlock-free operations is of crucial importance. In this context, a given design of a flexible manufacturing system (FMS) where vehicles serve workstations located along different modes of cyclic guided paths in a 3D environment composed of rails/lifts/hoists is considered. Furthermore, fuzzy processing time constraints on transportation operations, a production flows scheduling problem subject to an assumed set of constraints imposed by admissible production routes and schedules of AGV fleet in a given MHS are considered. Since this type of problem can be treated as a fuzzy constraint satisfaction problem, the main objective is to provide analytical formulas enabling the avoidance of time-consuming computer-simulation-based calculations of AGV fleet schedules, as well as vehicles deadlock and collisions, while keeping the throughput at the maximum achievable level. Results of computational experiments assessing the scalability of the proposed method are presented as well.
引用
收藏
页码:1105 / 1127
页数:23
相关论文
共 58 条
[1]   Part sequencing in three-machine no-wait robotic cells [J].
Agnetis, A ;
Pacciarelli, D .
OPERATIONS RESEARCH LETTERS, 2000, 27 (04) :185-192
[2]   Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies [J].
Anwar, MF ;
Nagi, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (03) :653-681
[3]   Real-time holonic scheduling of material handling operations in a dynamic manufacturing environment [J].
Babiceanu, RF ;
Chen, FF ;
Sturges, RH .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2005, 21 (4-5) :328-337
[4]  
Bach I, 2010, CONTROL CYBERN, V39, P69
[5]   DEADLOCK-AVOIDANCE IN FLEXIBLE MANUFACTURING SYSTEMS WITH CONCURRENTLY COMPETING PROCESS FLOWS [J].
BANASZAK, ZA ;
KROGH, BH .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1990, 6 (06) :724-734
[6]  
Banaszak ZA, 2006, INT SER OPER RES MAN, V92, P409, DOI 10.1007/978-0-387-33768-5_16
[7]   Object modeling and path computation for multimodal travel systems [J].
Bielli, Maurizio ;
Boulmakoul, Azedine ;
Mouncif, Hicham .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (03) :1705-1730
[8]   A time window approach to simultaneous scheduling of machines and material handling system in an FMS [J].
Bilge, U ;
Ulusoy, G .
OPERATIONS RESEARCH, 1995, 43 (06) :1058-1070
[9]  
Bocewicz G., 2007, LECT NOTES COMPUTER, V4496, P576
[10]   Iterative multimodal processes scheduling [J].
Bocewicz, Grzegorz ;
Nielsen, Izabela ;
Banaszak, Zbigniew .
ANNUAL REVIEWS IN CONTROL, 2014, 38 (01) :113-122