Modified processes capability assessment with dynamic mean shift

被引:8
作者
Wu, Chia-Huang [1 ]
机构
[1] Natl Chiao Tung Univ, Dept Ind Engn & Management, Hsinchu, Taiwan
关键词
control chart; dynamic processes; mean shift; production yield; (X)OVER-BAR CHART; MANUFACTURING YIELD; SHEWHART X; PERFORMANCE; PARAMETERS; DESIGN;
D O I
10.1002/qre.2628
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Rapid advancements in manufacturing technology have seen electronic products becoming lighter and thinner. This has led to production yield requirements of sawing processes in the semiconductor industry becoming increasingly strict. For sawing processes requiring a very low fraction of defective, the process capability index C-pk is widely applied for production yield measurement under the assumption of process stability. However, in practice, even when the typical control charts are implemented, dynamic and unobserved natures of the actual process mean shift may occur. Since the trial control limits are established with reference to random samples, the associated performances are also with uncertainty because of sampling error. In this paper, we investigate the effects of parameter estimation error on the development of the phase I control chart and further compare three methods with various estimators for the process standard deviation. Then, we tabulate the modified adjustment magnitudes for the dynamic C-pk under various subgroup sizes and sample sizes. On the basis of the simulation results, the proposed method can avoid overestimating the true process capability and make more trustworthy decisions. Finally, for demonstration purposes, an application of process capability measures for a sawing process is presented.
引用
收藏
页码:1258 / 1271
页数:14
相关论文
共 23 条
[1]   Estimation in Shewhart control charts: effects and corrections [J].
Albers, W ;
Kallenberg, WCM .
METRIKA, 2004, 59 (03) :207-234
[2]   Are estimated control charts in control? [J].
Albers, W ;
Kallenberg, WCM .
STATISTICS, 2004, 38 (01) :67-79
[3]   Statistical reason for the 1.5σ shift [J].
Bothe, Davis R. .
Quality Engineering, 2002, 14 (03) :479-487
[4]   The Variable Sample Size (X)over-bar Chart with Estimated Parameters [J].
Castagliola, Philippe ;
Zhang, Ying ;
Costa, Antonio ;
Maravelakis, Petros .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2012, 28 (07) :687-699
[5]   Run length, average run length and false alarm rate of Shewhart X-bar chart: Exact derivations by conditioning [J].
Chakraborti, S .
COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2000, 29 (01) :61-81
[6]   Percentile-based control chart design with an application to Shewhart (X)over-bar and S2 control charts [J].
Faraz, Alireza ;
Saniga, Erwin ;
Montgomery, Douglas .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2019, 35 (01) :116-126
[7]   Correction factors for Shewhart X and X control charts to achieve desired unconditional ARL [J].
Goedhart, Rob ;
Schoonhoven, Marit ;
Does, Ronald J. M. M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (24) :7464-7479
[8]   Capability adjustment or gamma processes with mean shift consideration in implementing Six Sigma program [J].
Hsu, Ya-Chen ;
Pearn, W. L. ;
Wu, Pei-Ching .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 191 (02) :516-528
[9]   An Effective Procedure for Calculating Weibull Production Yield with Mean Shift [J].
Hsu, Ya-Chen ;
Pearn, W. L. ;
Li, Yuan-Yi .
JOURNAL OF TESTING AND EVALUATION, 2012, 40 (03) :447-453
[10]   A re-evaluation of the run rules xbar chart when the process parameters are unknown [J].
Hu, XueLong ;
Castagliola, Philippe .
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2019, 16 (06) :696-725