Calculation Method for the Critical Thickness of a Karst Cave Roof at the Bottom of a Socketed Pile

被引:4
|
作者
Nie Qingke [1 ,2 ]
Li Xilai [3 ,4 ]
Yuan Wei [3 ,4 ]
Wang Anli [5 ]
Wang Wei [1 ,2 ]
Jia Xiangxin [1 ,2 ]
Shang Weidong [1 ,2 ]
机构
[1] China HeBei Construct & Geotech Invest Grp Ltd, Shijiazhuang 050227, Hebei, Peoples R China
[2] Hebei Res Ctr Geotech Engn Technol, Shijiazhuang 050227, Hebei, Peoples R China
[3] Shijiazhuang Tiedao Univ, Sch Civil Engn, Shijiazhuang 050043, Hebei, Peoples R China
[4] Shijiazhuang Tiedao Univ, State Key Lab Mech Behav & Syst Safety Traff Engn, Shijiazhuang 050043, Hebei, Peoples R China
[5] Guizhou Engn Technol Res Ctr Exploitat & Utilizat, Guiyang 550002, Peoples R China
关键词
Compendex;
D O I
10.1155/2021/1669410
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The thickness of a karst cave roof at the bottom of a socketed pile plays an important role in the vertical bearing capacity of the socketed pile in the karst region. In practice, its thickness is simply recommended to be not less than 3 times the diameter of the socketed pile, regardless of the geological conditions and the size of the cave itself. In this study, we present an approach for calculating the critical thickness-to-diameter ratio of a karst cave roof eta (eta = h/d, the ratio of karst cave roof thickness to pile diameter) based on the generalized Hoek-Brown criterion by virtue of the limit analysis method, which considers the pile tip load, hardness degree of the intact rock, and rock mass quality. The analysis results show that less load at the bottom of the pile, higher quality of rock mass, and more hard rock all lead to a smaller critical thickness-diameter ratio, whereas the critical thickness-to-diameter ratio is greater. The validity of the proposed method is verified through a physical model test.
引用
收藏
页数:11
相关论文
共 38 条
  • [1] An approach for determining the critical thickness of the karst cave roof at the bottom of socketed pile based on punch failure mode
    Yuan Wei
    Liu Shang-ge
    Nie Qing-ke
    Wang Wei
    ROCK AND SOIL MECHANICS, 2019, 40 (07) : 2789 - 2798
  • [2] A new method determining safe thickness of karst cave roof under pile tip
    Chong Jiang
    Lang Liu
    Jun-ping Wu
    Journal of Central South University, 2014, 21 : 1190 - 1196
  • [3] A new method determining safe thickness of karst cave roof under pile tip
    Jiang Chong
    Liu Lang
    Wu Jun-ping
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (03) : 1190 - 1196
  • [4] A new method determining safe thickness of karst cave roof under pile tip
    蒋冲
    刘浪
    吴均平
    JournalofCentralSouthUniversity, 2014, 21 (03) : 1190 - 1196
  • [5] Method for calculation of buckling critical load of pile foundation crossing karst cave in karst area
    Lei Yong
    Li Peng-jia
    Liu Ze-yu
    Li Jin-zhao
    Hu Wei
    ROCK AND SOIL MECHANICS, 2022, 43 (12) : 3347 - 3356
  • [6] A method for calculating the safety rock thickness of pile bearing strata with considering deadweight of karst cave roof
    Bai Hua-jun
    ROCK AND SOIL MECHANICS, 2016, 37 (10) : 2945 - 2952
  • [7] Study on calculation method for settlement of a single pile crossing filled karst cave
    Qiao, Shengshi
    Zhang, Qianqing
    Xing, Yucheng
    Zhang, Kai
    Wang, Zhiyuan
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2024, 55 (10): : 3909 - 3920
  • [8] Study on Roof Safe Thickness of Rock Foundation with Karst Cave and Karst Cave-surrounding Rock Stability
    Chen, Dongqin
    Yi, Cao
    4TH INTERNATIONAL CONFERENCE ON MECHANICS AND MECHATRONICS RESEARCH (ICMMR 2017), 2017, 224
  • [9] Calculation method of ultimate bearing capacity for rock layer of pile tip of bridge pile groups with underground karst cave
    Lei Yong
    Chen Yu-si
    Tan Hao
    Li Peng-jia
    Liu Yun-si
    Yu Yi-lin
    ROCK AND SOIL MECHANICS, 2023, 44 (12) : 3339 - 3348
  • [10] Variation of the ultimate bearing capacity of karst cave roof under the loading of pile foundation
    Wang, Li-Chang (wlccsu@126.com), 1600, E-Journal of Geotechnical Engineering (19):