A cost-effective simulation algorithm for inspection interval optimization: An application to mining equipment

被引:18
作者
Golbasi, Onur [1 ]
Demirel, Nuray [1 ]
机构
[1] Middle East Tech Univ, Dept Min Engn, TR-06800 Ankara, Turkey
关键词
Inspection interval; Optimization; Delay time; Production systems; Maintenance cost; RELIABILITY-ANALYSIS; REPAIRABLE SYSTEMS; MAINTAINABILITY ANALYSIS; PREVENTIVE MAINTENANCE; MODEL; POLICY; REPLACEMENT; COMPONENT; DETERIORATION; MACHINE;
D O I
10.1016/j.cie.2017.09.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In machinery maintenance policies, regular inspection intervals should be specified in such a way that the cumulative of direct and indirect financial consequences of maintenance activities should be minimized while supporting the functional health of system components. This study aims to develop a simulation algorithm, called the time-counter, to optimize inspection intervals. In the algorithm, uptime and downtime behaviors of the system components and production losses in the corrective repairs are considered random values. Delay time concept is regarded when estimating failure detection periods and deciding on the required maintenance type. In addition, the developed model is applied to two active draglines and their inspection intervals are optimized as 232 and 184 h for Dragline-1 and Dragline-2, respectively. The optimized values are observed to decrease the total maintenance costs by 5.9 and 6.2 percent for the given draglines, compared to the current interval of 160 h. The main novelties of the study are that (i) the proposed concept which allows for simultaneous assessment of system components in an incremental time span has not been proposed in the literature when deciding on optimal inspection intervals, (ii) it is the first initiative in inspection optimization of a mining machinery system, and (iii) it uses real datasets on lifetime, repair time, and financial values that are rarely observed in maintenance studies. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:525 / 540
页数:16
相关论文
共 78 条
  • [41] Ozdogan M., 1984, MADENCILIK, V23, P25
  • [42] Business-oriented prioritization: A novel graphical technique
    Pascual, R.
    Del Castillo, G.
    Louit, D.
    Knights, P.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2009, 94 (08) : 1308 - 1313
  • [43] Risk assessment model of mining equipment failure based on fuzzy logic
    Petrovic, Dejan V.
    Tanasijevic, Milos
    Milic, Vitomir
    Lilic, Nikola
    Stojadinovic, Sasa
    Svrkota, Igor
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (18) : 8157 - 8164
  • [44] Pillay A., 2004, P I MARINE ENG SCI A, P29
  • [45] MAINTENANCE PLAN FOR A FLEET OF ROTARY DRILL RIGS
    Rahimdel, Mohammad Javad
    Ataei, Mohammad
    Khalokakaei, Reza
    Hoseinie, Seyed Hadi
    [J]. ARCHIVES OF MINING SCIENCES, 2014, 59 (02) : 441 - 453
  • [46] A bi-objective inspection policy optimization model for finite-life repairable systems using a genetic algorithm
    Ramadan, S.
    [J]. ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2016, 11 (01): : 38 - 48
  • [47] Graphical methods for reliability of repairable equipment and maintenance planning
    Rao, KRM
    Prasad, PVN
    [J]. ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2001 PROCEEDINGS, 2001, : 123 - 128
  • [48] OR modelling of the deterioration and maintenance of concrete structure
    Redmond, DF
    Christer, AH
    Rigden, SR
    Burley, E
    Tajelli, A
    AbuTair, A
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 99 (03) : 619 - 631
  • [49] Roy SK, 2001, T I MIN METALL A, V10, P163, DOI DOI 10.1179/MNT.2001.110.3.163
  • [50] Samanta B, 2004, J S AFR I MIN METALL, V104, P1