A comparison of the performance of various project control methods using earned value management systems

被引:52
作者
Colin, Jeroen [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, B-9000 Ghent, Belgium
[3] UCL, Dept Management Sci & Innovat, London WC1E 6BT, England
关键词
Project management; Schedule control; Earned value management (EVM); Simulation; SENSITIVITY; INFORMATION; LIMITS;
D O I
10.1016/j.eswa.2014.12.007
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Recent literature on project management has emphasised the effort which is spent by the management team during the project control process. Based on this effort, a functional distinction can be made between a top down and a bottom up project control approach. A top down control approach refers to the use of a project control system that generates project based performance metrics to give a general overview of the project performance. Actions are triggered based on these general performance metrics, which need further investigation to detect problems at the activity level. A bottom up project control system refers to a system in which detailed activity information needs to be available constantly during the project control process, which requires more effort. In this research, we propose two new project control approaches, which combines elements of both top down and bottom up control. To this end, we integrate the earned value management/earned schedule (EVM/ES) method with multiple control points inspired by critical chain/buffer management (CC/BM). We show how the EVM/ES control approach is complementary with the concept of buffers and how they can improve the project control process when cleverly combined. These combined top down approaches overcome some of the drawbacks of traditional EVM/ES mentioned in the literature, while minimally increasing the effort spent by the project manager. A large computational experiment is set up to test the approach against other control procedures within a broad range of simulated dynamic project progress situations. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:3159 / 3175
页数:17
相关论文
共 49 条
[41]  
Vanhoucke M., 2014, MANAGEMENT PROFESSIO
[42]   An evaluation of the adequacy of project network generators with systematically sampled networks [J].
Vanhoucke, Mario ;
Coelho, Jose ;
Debels, Dieter ;
Maenhout, Broos ;
Tavares, Luis V. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (02) :511-524
[43]   Measuring the efficiency of project control using fictitious and empirical project data [J].
Vanhoucke, Mario .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (02) :252-263
[44]   On the dynamic use of project performance and schedule risk information during project tracking [J].
Vanhoucke, Mario .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2011, 39 (04) :416-426
[45]   Using activity sensitivity and network topology information to monitor project time performance [J].
Vanhoucke, Mario .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2010, 38 (05) :359-370
[46]   MONTE-CARLO METHODS AND THE PERT PROBLEM [J].
VANSLYKE, RM .
OPERATIONS RESEARCH, 1963, 11 (05) :839-860
[47]   Support Vector Machine Regression for project control forecasting [J].
Wauters, Mathieu ;
Vanhoucke, Mario .
AUTOMATION IN CONSTRUCTION, 2014, 47 :92-106
[48]  
WILLIAMS TM, 1995, J OPER RES SOC, V46, P1498
[49]  
[No title captured]