Scheduling of resource-constrained projects

被引:0
作者
Zilinskas, A [1 ]
机构
[1] Vytautas Magnus Univ, Inst Math & Informat, LT-2600 Vilnius, Lithuania
关键词
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:133 / 135
页数:3
相关论文
共 5 条
[1]  
BAKER J, 1974, INTRO SEQUENCING SCH
[2]  
Gen M., 2000, Genetic Algorithms and Engineering Optimization
[3]  
Klein R., 2000, SCHEDULING RESOURCE
[4]   Characterization and generation of a general class of resource-constrained project scheduling problems [J].
Kolisch, R ;
Sprecher, A ;
Drexl, A .
MANAGEMENT SCIENCE, 1995, 41 (10) :1693-1703
[5]  
Kolisch R., 1999, Project scheduling: Recent models, algorithms and applications, P147, DOI [DOI 10.1007/978-1-4615-5533-97, 10.1007/978-1-4615-5533-9_7, DOI 10.1007/978-1-4615-5533-9_7]