Rural Residents' Perception of Construction Project Delays in Pakistan

被引:11
作者
Hussain, Shahid [1 ]
Zhu, Fangwei [1 ]
Ali, Zaigham [2 ]
Xu, Xiaohang [3 ]
机构
[1] Dalian Univ Technol, Fac Management & Econ, Dalian 116024, Peoples R China
[2] Karakoram Int Univ, Dept Business Management, Gilgit Baltistan 15100, Pakistan
[3] Univ Technol Sydney, Sch Built Environm, Broadway, NSW 2007, Australia
基金
中国国家自然科学基金;
关键词
rural community; economic and social; infrastructure projects; delays; sustainable rural development; Pakistan; HEALTH-CARE; SOCIOECONOMIC IMPACTS; BUSINESS GROWTH; INFRASTRUCTURE; ACCESS; EDUCATION; BARRIERS; BENEFITS; POVERTY; QUALITY;
D O I
10.3390/su9112108
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The construction industry is one of the key sectors that facilitate sustainable economic and social development in the region. Currently, community development mechanisms are adopted by many developed and developing nations, aimed at enhancing economic growth and quality of life along with social welfare of the local community. This study reviews the rural residents' perception of public construction project delays and aims to explore economic and social challenges confronted by residents, especially in rural areas in Pakistan. A questionnaire with 26 factors identified from the literature was sent to rural educated residents. Through a questionnaire survey, the opinions of rural residents were sought and tested. Based on 366 (73%) valid responses, this study examined the socio-economic influencing factors. The findings of the study revealed that problems faced while traveling, increase the price of consumer goods, high transportation costs, lack of educational opportunities, more expenditures on education, and barriers to primary healthcare access were the top most important factors. Research results confirmed that the delays in construction projects negatively affect the socio-economic conditions of the rural community, which directly influence the rural dwells' sustainable life. The research findings suggest that the practitioners in public sector organization make sure to execute the project on time and within the quality. Otherwise, it has negative socio-economic implications for the rural community.
引用
收藏
页数:16
相关论文
共 87 条
[1]  
Abdul KadirM.R., 2005, STRUCT SURV, V23, P42
[2]   Delay mitigation in the Malaysian construction industry [J].
Abdul-Rahman, H ;
Berawi, MA ;
Berawi, AR ;
Mohamed, O ;
Othman, M ;
Yahya, IA .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (02) :125-133
[3]   Importance and ranking evaluation of delay factors for development construction projects in Benin [J].
Akogbe, Romuald-Kokou T. M. ;
Feng, Xin ;
Zhou, Jing .
KSCE JOURNAL OF CIVIL ENGINEERING, 2013, 17 (06) :1213-1222
[4]   The impact of contractors' attributes on construction project success: A post construction evaluation [J].
Alzahrani, Jaman I. ;
Emsley, Margaret W. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (02) :313-322
[5]  
Anriquez G., 2007, eJADE - Electronic Journal of Agricultural and Development Economics, V4, P5
[7]   The potential effects of variation orders on institutional building projects [J].
Arain, Faisal ;
Pheng, Low .
FACILITIES, 2005, 23 (11-12) :496-+
[8]  
Aschauer D. A., 1990, TRANSP RES BOARD, V21, P68
[9]   Assessing the socio-economic impacts of rural road improvements in Ghana: A case study of Transport Sector Program Support (II) [J].
Asomani-Boateng, Raymond ;
Fricano, Russell J. ;
Adarkwa, Frank .
CASE STUDIES ON TRANSPORT POLICY, 2015, 3 (04) :355-366
[10]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357