Optimal Regulation of the Cascade Gates Group Water Diversion Project in a Flow Adjustment Period

被引:5
作者
Zhu, Jie [1 ]
Zhang, Zhao [2 ]
Lei, Xiaohui [2 ]
Yue, Xia [1 ]
Xiang, Xiaohua [3 ]
Wang, Hao [1 ,2 ]
Ye, Mao [1 ,2 ]
机构
[1] Beijing Univ Technol, Coll Architecture & Civil Engn, Beijing 100124, Peoples R China
[2] China Inst Water Resources & Hydropower Res, Beijing 100038, Peoples R China
[3] Hohai Univ, Coll Hydrol & Water Resources, Nanjing 210098, Peoples R China
基金
中国国家自然科学基金;
关键词
cascade gates group; flow adjustment period; feedforward control; one-dimensional hydrodynamic model; optimal regulation; CANAL AUTOMATION; IRRIGATION; CONTROLLER; ALGORITHM;
D O I
10.3390/w13202825
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This study focuses on the regulation demand of the cascade gates group water diversion project during the flow adjustment period. A multi-objective optimization regulation model was coupled with the one-dimensional hydrodynamic model and the multi-objective genetic algorithm. Gate opening was used as the decision variable to generate the local operation-oriented cascade gates group regulation scheme. This study considered the Shijiazhuang to Beijing section of the middle route of the South-to-North Water Diversion Project. The optimal operation model has a better control effect than the conventional control method, and the number of gate operations was reduced by 23.38%. The average water level deviation was less than 0.15 m when the feedforward control time of the cascade gates group water diversion project was not more than 24 h. The basic mechanism of maintaining water level stability during the short-term scheduling of the cascade gates group water diversion project makes use of the volume capacity, or the space of the channel pool adjacent to the water demand change position, in advance. The multi-objective optimal regulation model of the cascade gates group that was constructed in this study can quickly generate regulation schemes for different application scenarios.</p>
引用
收藏
页数:16
相关论文
共 26 条
  • [1] Volume compensation method for routing irrigation canal demand changes
    Bautista, E
    Clemmens, AJ
    [J]. JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 2005, 131 (06) : 494 - 503
  • [2] Buyalski C.P., 1991, Canal systems automation manual, V1
  • [3] Test cases for canal control algorithms
    Clemmens, AJ
    Kacerek, TF
    Grawitz, B
    Schuurmans, W
    [J]. JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 1998, 124 (01) : 23 - 30
  • [4] Cui W., 2015, J CHINA I WATER RESO, V13, P421
  • [5] CANAL CONTROLLER FOR THE LARGEST WATER TRANSFER PROJECT IN CHINA
    Cui, Wei
    Chen, Wenxue
    Mu, Xiangpeng
    Bai, Yinbaoligao
    [J]. IRRIGATION AND DRAINAGE, 2014, 63 (04) : 501 - 511
  • [6] [崔巍 CUI Wei], 2009, [水利学报, Journal of Hydraulic Engineering], V40, P1345
  • [7] A fast and elitist multiobjective genetic algorithm: NSGA-II
    Deb, K
    Pratap, A
    Agarwal, S
    Meyarivan, T
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) : 182 - 197
  • [8] [樊玉苗 Fan Yumiao], 2018, [排灌机械工程学报, Journal of Drainage and Irrigation Machinery Engineering], V36, P1131
  • [9] [郭旭宁 Guo Xuning], 2016, [水力发电学报, Journal of Hydroelectric Engineering], V35, P19
  • [10] Lin B., 1996, J ZHEJIANG U ENG SCI, V30, P652