Petri Net-Based Scheduling of Single-Arm Cluster Tools With Reentrant Atomic Layer Deposition Processes

被引:119
作者
Wu, NaiQi [1 ]
Chu, Feng [2 ]
Chu, Chengbin [3 ]
Zhou, MengChu [4 ,5 ]
机构
[1] Guangdong Univ Technol, Dept Ind Engn, Sch Mechatron Engn, Guangzhou 510006, Guangdong, Peoples R China
[2] Univ Evry Val dEssonne, Lab IBISC FRE CNRS 3190, F-91020 Evry, France
[3] Ecole Cent Paris, Lab Genie Ind, F-92295 Chatenay Malabry, France
[4] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
[5] Tongji Univ, Dept Comp Sci & Technol, Shanghai 201804, Peoples R China
基金
美国国家科学基金会;
关键词
Cluster tools; optimization; Petri nets (PNs); scheduling; semiconductor fabrication; STEADY-STATE THROUGHPUT; GRIPPER ROBOTIC CELLS; MANUFACTURING SYSTEMS; DEADLOCK-AVOIDANCE; MULTICLUSTER TOOLS; OPTIMIZATION; PERFORMANCE;
D O I
10.1109/TASE.2010.2046736
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
For some wafer fabrication processes in cluster tools, e.g., atomic layer deposition (ALD), wafer revisiting is required. Typically, in such processes, wafers need to visit two consecutive processing steps several times. Such a revisiting process can be denoted as (m(i), m(i+1))(h), where i means the ith-step and m(i) and m(i+1) mean the corresponding quantity of the processing modules in i and (i+1)th steps, and h the number of visiting times. This paper conducts a study for scheduling single-arm cluster tools with such a wafer revisiting process. The system is modeled by Petri nets (PNs) to guarantee the feasibility of robot activities. Based on the model, a deadlock avoidance policy is presented. With the control policy, cycle time analysis for the revisiting process is made. With the fact that wafer processing times are much longer than robot movement times in cluster tools, it is shown that, when m(i) = m(i+1) = 1, i.e., each step has only one processing module, the optimal one-wafer cyclic schedule is deterministic and unique, and the minimal cycle time can be calculated by an analytical expression. It is also shown that, when m(i) = 1 and m(i+1) = 2 or m(i) = 2 and m(i+1) = 1, the optimal one-wafer cyclic schedule can be obtained by finding h deterministic schedules and the one with the least cycle time. A novel analytical method is finally presented to schedule the overall system containing such reentrant wafer flow. This represents a significant advance in single-arm cluster equipment automation. Note to Practitioners-This paper addresses the scheduling problem of single-arm cluster tools with reentrant atomic layer deposition (ALD) processes-a typical wafer revisiting pattern in semiconductor fabrication. The revisiting process is characterized by two consecutive processing steps that must repeat h times. By analyzing the mechanism of such revisiting process, this paper presents a formal PN-based model and scheduling method such that an optimal one-wafer cyclic schedule can be found by comparing only h deterministic schedules. Thus, it is readily applicable to semiconductor manufacturing applications that require reentrant ADL processes.
引用
收藏
页码:42 / 55
页数:14
相关论文
共 37 条
[1]  
BADER ME, 1990, SOLID STATE TECHNOL, V33, P149
[2]   Identical part production in cyclic robotic cells: Concepts, overview and open questions [J].
Brauner, Nadia .
DISCRETE APPLIED MATHEMATICS, 2008, 156 (13) :2480-2492
[3]  
Burggraaf P., 1995, Semiconductor International, V18, P45
[4]  
Chan W. K. V., 2010, IEEE T AUTO IN PRESS
[5]   Cyclic scheduling of identical parts in a robotic cell [J].
Crama, Y ;
Van de Klundert, J .
OPERATIONS RESEARCH, 1997, 45 (06) :952-965
[6]   Cyclic scheduling in robotic flowshops [J].
Crama, Y ;
Kats, V ;
van de Klundert, J ;
Levner, E .
ANNALS OF OPERATIONS RESEARCH, 2000, 96 (1-4) :97-124
[7]   On throughput maximization in constant travel-time robotic cells [J].
Dawande, Milind ;
Sriskandarajah, Chelliah ;
Sethi, Suresh .
Manufacturing and Service Operations Management, 2002, 4 (04) :296-312
[8]   Throughput optimization in dual-gripper interval robotic cells [J].
Dawande, Milind ;
Geismar, H. Neil ;
Pinedo, Michael ;
Sriskandarajah, Chelliah .
IIE TRANSACTIONS, 2010, 42 (01) :1-15
[9]  
Dawande MW, 2007, INT SER OPER RES MAN, V101, P1, DOI 10.1007/0-387-70988-6
[10]   Multicluster tools scheduling: An integrated event graph and network model approach [J].
Ding, Shengwei ;
Yi, Jingang ;
Zhang, Mike Tao .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2006, 19 (03) :339-351