Peak loads and network investments in sustainable energy transitions

被引:20
作者
Blokhuis, Erik [1 ]
Brouwers, Bart [1 ]
van der Putten, Eric [2 ]
Schaefer, Wim [1 ]
机构
[1] Eindhoven Univ Technol, Dept Architecture Bldg & Planning, NL-5600 MB Eindhoven, Netherlands
[2] Endinet, Gas & Elect Network Operat, NL-5600 CA Eindhoven, Netherlands
关键词
Energy transition; Peak load; Network investments; DISTRIBUTED GENERATION; RENEWABLE ENERGY; INTEGRATION;
D O I
10.1016/j.enpol.2011.07.021
中图分类号
F [经济];
学科分类号
02 ;
摘要
Current energy distribution networks are often not equipped for facilitating expected sustainable transitions. Major concerns for future electricity networks are the possibility of peak load increases and the expected growth of decentralized energy generation. In this article, we focus on peak load increases; the effects of possible future developments on peak loads are studied, together with the consequences for the network. The city of Eindhoven (the Netherlands) is used as reference city, for which a scenario is developed in which the assumed future developments adversely influence the maximum peak loads on the network. In this scenario, the total electricity peak load in Eindhoven is expected to increase from 198 MVA in 2009 to 591-633 MVA in 2040. The necessary investments for facilitating the expected increased peak loads are estimated at 305-375 million Euros. Based upon these projections, it is advocated that - contrary to current Dutch policy - choices regarding sustainable transitions should be made from the viewpoint of integral energy systems, evaluating economic implications of changes to generation, grid development, and consumption. Recently applied and finished policies on energy demand reduction showed to be effective; however, additional and connecting policies on energy generation and distribution should be considered on short term. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:6220 / 6233
页数:14
相关论文
共 35 条
[1]  
[Anonymous], 2009, Sustainable Energy-without the hot air
[2]  
[Anonymous], E09EQS3004 ERGEG
[3]  
CBS (Netherlands Central Bureau for Statistics), 2010, HERN EN NED 2009
[4]  
CBS Statline, 2010, WERKG ARB LON WERKN
[5]  
Commission of the European Communities (CoEC), 2008, COM2008782 COEC
[6]  
Commission of the European Communities (CoEC), 2008, COM2008772 COEC
[7]   Towards a future with large penetration of distributed generation: Is the current regulation of electricity distribution ready? Regulatory recommendations under a European perspective [J].
Cossent, Rafael ;
Gomez, Tomas ;
Frias, Pablo .
ENERGY POLICY, 2009, 37 (03) :1145-1155
[8]   Increasing penetration of renewable and distributed electricity generation and the need for different network regulation [J].
de Joode, J. ;
Jansen, J. C. ;
van der Welle, A. J. ;
Scheepers, M. J. J. .
ENERGY POLICY, 2009, 37 (08) :2907-2915
[9]  
Dutch Energy Chamber, 2009, BESP TOEK REG NETB
[10]  
[ECN PBL], 2010, REF PROJ EN EM 2010