Local opposition against high-voltage grids: public responses to agency-caused science-policy trolls

被引:9
作者
Aas, Oystein [1 ]
Qvenild, Marte [3 ,4 ]
Wold, Line Camilla [2 ]
Jacobsen, Gerd Blindheim [5 ,6 ]
Ruud, Audun [3 ,5 ]
机构
[1] Norwegian Inst Nat Res NINA, Res Social Sci, Lillehammer, Norway
[2] Norwegian Inst Nat Res NINA, N-2614 Fakkelgarden, Lillehammer, Norway
[3] Norwegian Inst Nat Res NINA, Oslo, Norway
[4] Norwegian Res Council, Lysaker, Norway
[5] SINTEF Energy Res, Dept Thermal Energy, Unit Policy & Governance, Trondheim, Norway
[6] Akershus Cty Council, Oslo, Norway
关键词
Renewable energy planning; value assessments; public engagement; decision-making; monster; public issues; boundary objects; PERCEPTIONS; UNCERTAINTY; ENGAGEMENT; OUTCOMES; BELIEFS; NORWAY;
D O I
10.1080/1523908X.2016.1213625
中图分类号
F0 [经济学]; F1 [世界各国经济概况、经济史、经济地理]; C [社会科学总论];
学科分类号
0201 ; 020105 ; 03 ; 0303 ;
摘要
High-voltage (hV) transmission grids are projects of societal importance that potentially have controversial social and environmental impacts. Former research shows that public opposition is sparked by the perception of negative local impacts and unjust concessionary processes. In this paper, we complement these perspectives by assessing the institutional practices of the regulatory agencies in dealing with scientific uncertainties. The regulatory agencies' ways of doing things' are often designed to serve policy and management needs. A critical point is that the demarcation between scientifically based facts, values and assessments is often blurred in the decision-making process. This paper draws on two Norwegian case studies to investigate how the regulatory agencies dealt with (1) electromagnetic fields and health risks and (2) overhead lines versus sea cables. We argue that ambiguities and uncertainties that arise in the hV transmission line processes create trolls', and we explore how the local inhabitants and affected stakeholders in the two cases responded to these and how it triggered further opposition. By investigating how and why trolls appear and are handled, we conclude by discussing how public opposition related to hV transmission grids may be reduced - and how some trolls' may crack.
引用
收藏
页码:347 / 359
页数:13
相关论文
共 46 条
[1]   Public beliefs about high-voltage powerlines in Norway, Sweden and the United Kingdom: A comparative survey [J].
Aas, Oystein ;
Devine-Wright, Patrick ;
Tangeland, Torvald ;
Batel, Susana ;
Ruud, Audun .
ENERGY RESEARCH & SOCIAL SCIENCE, 2014, 2 :30-37
[2]  
[Anonymous], 2013, Wolf conflicts: A sociological survey
[3]  
Arrillaga J., 1998, HV DIRECT CURRENT TR
[4]   The role of (de-)essentialisation within siting conflicts: An interdisciplinary approach [J].
Batel, Susana ;
Devine-Wright, Patrick ;
Wold, Line ;
Egeland, Helene ;
Jacobsen, Gerd ;
Aas, Oystein .
JOURNAL OF ENVIRONMENTAL PSYCHOLOGY, 2015, 44 :149-159
[5]   The Premises and Promises of Trolls in Norwegian Biodiversity Preservation On the Boundaries Between Bureaucracy and Science [J].
Bay-Larsen, Ingrid .
ENVIRONMENTAL MANAGEMENT, 2012, 49 (05) :942-953
[6]  
Braun V, 2006, QUAL RES PSYCHOL, V3, DOI [DOI 10.1191/1478088706QP063OA, 10.1191/1478088706qp063oa]
[7]   Making electricity networks "visible": Industry actor representations of "publics" and public engagement in infrastructure planning [J].
Cotton, Matthew ;
Devine-Wright, Patrick .
PUBLIC UNDERSTANDING OF SCIENCE, 2012, 21 (01) :17-35
[8]   Discourses of energy infrastructure development: a Q-method study of electricity transmission line siting in the UK [J].
Cotton, Matthew ;
Devine-Wright, Patrick .
ENVIRONMENT AND PLANNING A-ECONOMY AND SPACE, 2011, 43 (04) :942-960
[9]   CLIMATE SCIENCE AND THE UNCERTAINTY MONSTER [J].
Curry, J. A. ;
Webster, P. J. .
BULLETIN OF THE AMERICAN METEOROLOGICAL SOCIETY, 2011, 92 (12) :1667-+
[10]   Explaining public preferences for high voltage pylon designs: An empirical study of perceived fit in a rural landscape [J].
Devine-Wright, Patrick ;
Batel, Susana .
LAND USE POLICY, 2013, 31 :640-649