EU contribution to the procurement of blanket first wall and divertor components for ITER

被引:7
作者
Lorenzetto, Patrick [1 ]
Andrade, Jose [1 ]
Banetta, Stefano [1 ]
Cicero, Tindaro [1 ]
Dellopoulos, Georges [1 ]
Durocher, Alain [2 ]
Escourbiac, Frederic [2 ]
Felip, Montse [1 ]
Ferrand, Laurent [2 ]
Gavila, Pierre [1 ]
Gicquel, Stefan [2 ]
Guerrini, Laurent [1 ]
Heikkinen, Samuli [1 ]
Marshall, Paul [1 ]
Merola, Mario [2 ]
Mitteau, Raphael [2 ]
Raffray, Rene [2 ]
Riccardi, Bruno [1 ]
机构
[1] Fus Energy, Torres Diagonal Litoral B3,Carrer Josep Pla 2, Barcelona 08019, Spain
[2] TIER Org, Route Vinon Sur Verdon,CS90046, F-13067 St Paul Les Durance, France
关键词
ITER; Blanket first wall; Divertor cassette; Divertor inner vertical target; RESEARCH-AND-DEVELOPMENT; SEMI-PROTOTYPE;
D O I
10.1016/j.fusengdes.2018.04.050
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Fusion for Energy (F4E), the European Domestic Agency for ITER, is responsible for a significant share of the overall procurement of internal components inside the vacuum vessel, the largest ones being as follows: (1) 48% of the ITER blanket first wall (FW), (2) the divertor cassette bodies and (3) the divertor inner vertical target. Procurement strategies have been implemented by the In-Vessel Project Team at F4E aiming at mitigating technical and commercial risks for the procurement of these ITER internal components, promoting as far as possible competition among industrial partners. These procurement strategies have been supported by extensive research and development (R&D) work programmes, implemented over more than 15 years in Europe, to develop various fabrication technologies especially for plasma facing components. They include in particular the manufacture and testing of small-scale mock-ups, medium-scale mock-ups and full-scale prototypes of blanket FW panels and divertor inner vertical targets. In these R&D work programmes, significant efforts have been devoted to the development of reliable armour-to-heat sink materials joining techniques. More recently, full-scale prototypes of the divertor cassette body have also been fabricated. This paper presents the procurement strategies implemented by F4E for the supply of the European contribution to the procurement of the above ITER internal components, together with the main outcome of the R&D work programmes and the state of progress of the respective qualification programmes.
引用
收藏
页码:975 / 982
页数:8
相关论文
共 11 条
[1]   Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification [J].
Banetta, S. ;
Bellin, B. ;
Lorenzetto, P. ;
Zacchia, F. ;
Boireau, B. ;
Bobin, I. ;
Boiffard, P. ;
Cottin, A. ;
Nogue, P. ;
Mitteau, R. ;
Eaton, R. ;
Raffray, R. ;
Buerger, A. ;
Du, J. ;
Linke, J. ;
Pintsuk, G. ;
Weber, T. .
FUSION ENGINEERING AND DESIGN, 2015, 98-99 :1211-1215
[2]   Manufacturing of small-scale mock-ups and of a semi-prototype the ITER Normal Heat Flux First Wall [J].
Banetta, S. ;
Zacchia, F. ;
Lorenzetto, P. ;
Bobin-Vastra, I. ;
Boireau, B. ;
Cottin, A. ;
Mitteau, R. ;
Eaton, R. ;
Raffray, R. .
FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) :970-974
[3]   Progress in the design of Normal Heat Flux First Wall panels for ITER [J].
Cicero, Tindaro ;
Jimenez, Marc ;
D'Amico, Gabriele ;
Ayneto Pou, Jordi ;
Dellopoulos, Georges ;
Alvaro, Elena ;
Cardenes, Sabas ;
Banetta, Stefano ;
Bellin, Boris ;
Zacchia, Francesco ;
Calcagno, Barbara ;
Chappuis, Philippe ;
Gicquel, Stefan ;
Mitteau, Raphael ;
Raffray, Rene .
FUSION ENGINEERING AND DESIGN, 2015, 98-99 :1256-1262
[4]   High heat flux testing of mock-ups for a full tungsten ITER divertor [J].
Gavila, P. ;
Riccardi, B. ;
Constans, S. ;
Jouvelot, J. L. ;
Vastra, I. Bobin ;
Missirlian, M. ;
Richou, M. .
FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) :1652-1655
[5]   Commissioning phase of high heat flux test facility HELCZA [J].
Jilek, R. ;
Prokupek, J. ;
Gavila, P. ;
Samec, K. ;
Neufuss, S. .
FUSION ENGINEERING AND DESIGN, 2017, 124 :344-347
[6]   EU R&D on the ITER First Wall [J].
Lorenzetto, P ;
Peacock, A ;
Bobin-Vastra, I ;
Briottet, L ;
Bucci, P ;
Dell'Orco, G ;
Ioki, K ;
Roedig, M ;
Sherlock, P .
FUSION ENGINEERING AND DESIGN, 2006, 81 (1-7) :355-360
[7]   EU contribution to the procurement of the ITER blanket first wall [J].
Lorenzetto, Patrick ;
Banetta, Stefano ;
Bellin, Boris ;
Boireau, Bruno ;
Bucci, Philippe ;
Cicero, Tindaro ;
Conchon, Denis ;
Dellopoulos, Georges ;
Hardaker, Stephen ;
Marshall, Paul ;
Nogue, Patrice ;
Perez, Marcos ;
Ruiz Gutierrez, Leticia ;
Samaniego, Fernando ;
Sherlock, Paul ;
Zacchia, Francesco .
FUSION ENGINEERING AND DESIGN, 2016, 109 :661-665
[8]   EU R&D on divertor components [J].
Merola, M ;
Dänner, W ;
Pick, A .
FUSION ENGINEERING AND DESIGN, 2005, 75-79 :325-331
[9]   Engineering challenges and development of the ITER Blanket System and Divertor [J].
Merola, Mario ;
Escourbiac, Frederic ;
Raffray, Alphonse Rene ;
Chappuis, Philippe ;
Hirai, Takeshi ;
Gicquel, Stefan .
FUSION ENGINEERING AND DESIGN, 2015, 96-97 :34-41
[10]   The ITER blanket system design challenge [J].
Raffray, A. R. ;
Calcagno, B. ;
Chappuis, P. ;
Fu, Zhang ;
Furmanek, A. ;
Chen Jiming ;
Kim, D-H. ;
Khomiakov, S. ;
Labusov, A. ;
Martin, A. ;
Merola, M. ;
Mitteau, R. ;
Sadakov, S. ;
Ulrickson, M. ;
Zacchia, F. .
NUCLEAR FUSION, 2014, 54 (03)