An envelopment learning procedure for improving prediction accuracies of grey models

被引:13
作者
Chen, Chien-Chih [1 ]
Chang, Che-Jung [2 ]
Zhuang, Zheng-Yun [3 ]
Li, Der-Chiang [1 ]
机构
[1] Natl Cheng Kung Univ, Dept Ind & Informat Management, 1 Univ Rd, Tainan 70101, Taiwan
[2] Ningbo Univ, Business Sch, Dept Management Sci & Engn, 818 Fenghua Rd, Ningbo 315211, Zhejiang, Peoples R China
[3] Natl Kaohsiung Univ Sci & Technol, Dept Civil Engn, 415 Jiangong Rd, Kaohsiung, Taiwan
关键词
Short term time series data; Fuzzy time series; Grey models; FORECASTING-MODEL; ENERGY-CONSUMPTION; KNOWLEDGE; DEMAND;
D O I
10.1016/j.cie.2019.106185
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Because the lifecycles of consumable electronic products are now very short, it has become very difficult for manufacturers to precisely determine customer demands with limited historical data. Over the past two decades, the grey model (GM) and its extensions have been shown to be effective tools to deal with short-term time series data. To further enforce the effectiveness of data uncertainty treatment for dynamic integrated-circuit assembly industries, a GM envelopment learning procedure is developed. In our procedure, short term series data is fuzzified to form a fuzzy time series for the purpose of building GM models, in which the final predictions are further aggregated with the proposed weights. The experimental results of a real case and a public dataset indicate that the proposed procedure can further improve the accuracy of predictions given by GM models and thus has practical value in tackling real cases.
引用
收藏
页数:9
相关论文
共 32 条
  • [1] Agent-based modelling and heuristic approach for solving complex OEM flow-shop productions under customer disruptions
    Adediran, Tunde, V
    Al-Bazi, Ammar
    dos Santos, Luiz Eduardo
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 133 : 29 - 41
  • [2] [Anonymous], 2019, MATH PROBLEMS ENG, DOI [DOI 10.1155/2019/2385310, DOI 10.1007/S12253-019-00655-8]
  • [3] [Anonymous], 1982, International and business forecasting methods
  • [4] A novel gray forecasting model based on the box plot for small manufacturing data sets
    Chang, Che-Jung
    Li, Der-Chiang
    Huang, Yi-Hsiang
    Chen, Chien-Chih
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2015, 265 : 400 - 408
  • [5] Handling forecasting problems based on high-order fuzzy logical relationships
    Chen, Shyi-Ming
    Chen, Chao-Dian
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) : 3857 - 3864
  • [6] Forecasting enrollments based on fuzzy time series
    Chen, SM
    [J]. FUZZY SETS AND SYSTEMS, 1996, 81 (03) : 311 - 319
  • [7] Forecasting enrollments based on high-order fuzzy time series
    Chen, SM
    [J]. CYBERNETICS AND SYSTEMS, 2002, 33 (01) : 1 - 16
  • [8] CONTROL-PROBLEMS OF GREY SYSTEMS
    DENG, JL
    [J]. SYSTEMS & CONTROL LETTERS, 1982, 1 (05) : 288 - 294
  • [9] Fayyad U, 1996, AI MAG, V17, P37
  • [10] Acquiring knowledge with limited experience
    Li, Der-Chiang
    Yeh, Chun-Wu
    Tsai, Tung-I
    Fang, Yao-Hwei
    Hu, Susan C.
    [J]. EXPERT SYSTEMS, 2007, 24 (03) : 162 - 170