Implementation of hydraulic modelling for site selection of pump as turbines for pressure reduction and power production in water distribution networks

被引:2
作者
Ozen, Ozge [1 ]
Gulaydin, Oguzhan [1 ]
Karadirek, I. Ethem [1 ]
Muhammetoglu, Ayse [1 ]
Muhammetoglu, Habib [1 ]
机构
[1] Akdeniz Univ, Fac Engn, Dept Environm Engn, Antalya, Turkey
关键词
Pump as turbine; Energy recovery; Hydraulic modelling; Water distribution network; Water losses; ENERGY RECOVERY; NUMERICAL-MODEL; MANAGEMENT; SYSTEMS; HYDROPOWER; COST;
D O I
10.5004/dwt.2017.21056
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Inefficient management of water distribution networks (WDNs) causes a serious problem of water losses in many countries. Excess water pressure is one of the main factors that increases leakage in WDNs. Pressure management is an efficient and economically feasible method to reduce physical water losses in WDNs, and is generally achieved by installing pressure reducing valves (PRVs). Recently, pump as turbine (PAT) has become a viable option to replace PRVs. In this study, water losses reduction, power production potential, CO 2 emissions reduction and payback period were investigated for Konyaalti WDN, which is composed of 18 district metered areas (DMAs), with implementation of PAT. Population, water demands and flow rates were forecasted for the years 2020, 2025 and 2035. A hydraulic modelling study was conducted to determine the optimum pressure levels to be maintained at the entrance of each DMA. Temporal and spatial variations of water pressure and excess water pressure levels were obtained for minimum and maximum water consumption periods. The investigation revealed that DMA-6 was the best site for implementation of PAT with a payback period of 0.85 year. Long-term analysis of hydraulic parameters (water demand, flow rate, excess water pressure) and evaluation of environmental benefits and payback period are necessary for optimal site selection of PAT.
引用
收藏
页码:311 / 319
页数:9
相关论文
共 42 条
[1]   Electrical Energy Recovery From Network Water Pressure [J].
Borkowski, Dariusz ;
Sulowicz, Maciej ;
Wegiel, Tomasz ;
Liszka, Damian .
2015 SELECTED PROBLEMS OF ELECTRICAL ENGINEERING AND ELECTRONICS (WZEE), 2015,
[2]  
Brady Jennifer, 2017, Journal of Water Resources Planning and Management, V143, DOI 10.1061/(ASCE)WR.1943-5452.0000731
[3]   Automatic control valve-induced transients in operative pipe system [J].
Brunone, B ;
Morelli, L .
JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1999, 125 (05) :534-542
[4]  
Can O., 2007, CARBON MANAGEMENT VO
[5]   Cost-Benefit Analysis for Hydropower Production in Water Distribution Networks by a Pump as Turbine [J].
Carravetta, Armando ;
Fecarotta, Oreste ;
Sinagra, Marco ;
Tucciarelli, Tullio .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2014, 140 (06)
[6]   Energy Production in Water Distribution Networks: A PAT Design Strategy [J].
Carravetta, Armando ;
Del Giudice, Giuseppe ;
Fecarotta, Oreste ;
Ramos, Helena M. .
WATER RESOURCES MANAGEMENT, 2012, 26 (13) :3947-3959
[7]   Efficiency achievement in water supply systems-A review [J].
Coelho, B. ;
Andrade-Campos, A. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2014, 30 :59-84
[8]   Predicting and quantifying the effect of variations in long-term water demand on micro-hydropower energy recovery in water supply networks [J].
Corcoran, Lucy ;
McNabola, Aonghus ;
Coughlan, Paul .
URBAN WATER JOURNAL, 2017, 14 (07) :676-684
[9]   Optimization of Water Distribution Networks for Combined Hydropower Energy Recovery and Leakage Reduction [J].
Corcoran, Lucy ;
McNabola, Aonghus ;
Coughlan, Paul .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2016, 142 (02)
[10]   Energy recovery in water distribution networks. Implementation of pumps as turbine in a dynamic numerical model [J].
De Marchis, M. ;
Fontanazza, C. M. ;
Freni, G. ;
Messineo, A. ;
Milici, B. ;
Napoli, E. ;
Notaro, V. ;
Puleo, V. ;
Scopa, A. .
12TH INTERNATIONAL CONFERENCE ON COMPUTING AND CONTROL FOR THE WATER INDUSTRY, CCWI2013, 2014, 70 :439-448