共 33 条
[1]
Atkinson R., 1999, International Journal of Project Management, e-journal, V17, P337, DOI [10.1016/S0263-7863(98)00069-6, DOI 10.1016/S0263-7863(98)00069-6]
[2]
Bryde D. J., 2005, International Journal of Project Management, V23, P622, DOI 10.1016/j.ijproman.2005.05.003
[4]
Cooke-Davies T., 2002, Int J Proj Manag, V20, P185, DOI [10.1016/S0263-7863(01)00067-9, DOI 10.1016/S0263-7863(01)00067-9]
[5]
Management's perception of key performance indicators for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2003, 129 (02)
:142-151
[6]
De Wit A., 1988, INT J PROJ MANAG, V6, P164, DOI DOI 10.1016/0263-7863(88)90043-9
[8]
Hofstede G., 1991, CULTURES ORG