Research on Casing Deformation Prevention Technology of a Deep Shale Gas Well Based on Cementing Slurry System Optimization

被引:4
作者
Cao, Jing [1 ]
Yang, Shangyu [1 ]
Han, Lihong [1 ]
Wang, Jianjun [1 ]
Mou, Yisheng [1 ]
Lu, Caihong [1 ]
机构
[1] CNPC Tubular Goods Res Inst, State Key Lab Performance & Struct Safety Petr Tu, Xian 710077, Peoples R China
关键词
shale gas; casing deformation; cement slurry; shearing; external extrusion; FAILURE;
D O I
10.3390/pr10091678
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In the complex fracturing process of shale gas wells, casing is subjected to serious deformation, which can easily to the failure of wellbore integrity and the reduction of well construction productivity. It is particularly important to clarify the casing deformation mechanism and carry out effective control. Based on the logging data of casing deformation from well and full-scale indoor tests, the casing deformation mechanism is mainly considered to be shear and non-uniform extrusion deformation caused by formation slip and displacement control, i.e., the ultimate working conditions. The slip displacement boundary (<40 mm) under complex fracturing conditions is quantified to provide the design and optimization basis. Then, the influence laws of steel grade and wall thickness on the shear and non-uniform extrusion bearing characteristics are studied, using unconventional oil and gas well casing simulation test systems for 110 ksi (phi 139.7 x 10.54 mm) and 125 ksi (phi 139.7 x 12.7 mm) casings. Furthermore, combined with the full-scale simulation tests and finite-element simulation, the effects of elastic and modified cement slurry with hollow glass beads on casing deformation are compared and studied. The results show that the deformation capacity mitigation of casing is limited by reducing the cement elastic modulus and increasing the elastic cement thickness. By reasonably adding hollow glass beads of modified cement slurry, the maximum geological movement absorption of cement slurry is up to 27 mm. This new method can obviously decrease casing deformation and have an excellent control effect. Combined with the cementing technology of Luzhou blocks, the formula of modified cement slurry is optimized, and the optimization window of the casing deformation control process is formed, which can ensure the smooth progress of engineering fracturing.
引用
收藏
页数:19
相关论文
共 19 条
[1]  
Bai L., 2019, P 29 INT OCEAN POLAR
[2]  
Blake R, 2014, P SPE ANN TECHN C EX, DOI 10.2118/170888-MS
[3]  
Casero A., 2020, SPE HYDR FRACT TECHN, DOI [10.2118/199710-MS, DOI 10.2118/199710-MS]
[4]  
Daneshy A.A., 2005, P SPE W REG M IRV CA, p93620
[5]   Cement Sheath Failure Mechanisms: Numerical Estimates to Design for Long-Term Well Integrity [J].
De Andrade, Jesus ;
Sangesland, Sigbjorn .
JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2016, 147 :682-698
[6]  
Deenadayalu C., 2010, AM ROCK MECH ASS, V10, P27
[7]  
[高德利 Gao Deli], 2019, [石油与天然气地质, Oil & Gas Geology], V40, P602
[8]  
Han L., 2020, PET TUBUL GOODS INST, V6, P16
[9]  
Hu C., 2016, SPE IADC MIDDL E DRI, DOI [10.2118/178144-MS, DOI 10.2118/178144-MS]
[10]  
Landry G., 2015, P SPE WELL INTEGRITY