Joint-Venture Contractor Selection Using Competitive and Collaborative Criteria with Uncertainty

被引:29
作者
Liang, Ru [1 ]
Zhang, Jinwen [1 ,2 ]
Wu, Changzhi [3 ]
Sheng, Zhaohan [1 ]
Wang, Xiangyu [4 ,5 ]
机构
[1] Nanjing Univ, Sch Management & Engn, Nanjing 210093, Jiangsu, Peoples R China
[2] Hong Kong Zhuhai Macao Bridge Author, 368 Henglong Rd, Xiangzhou Dist 519060, Zhuhai, Peoples R China
[3] Guangzhou Univ, Sch Management, Guangzhou 510006, Guangdong, Peoples R China
[4] Curtin Univ, Sch Built Environm, Perth, WA 6102, Australia
[5] Kyung Hee Univ, Dept Housing & Interior Design, Seoul 130701, South Korea
基金
中国国家自然科学基金;
关键词
Joint venture contractor; Multiple-criteria decision making (MCDM); Uncertainty; Infrastructure projects; GROUP DECISION-MAKING; SUBCONTRACTOR SELECTION; SUPPLIER SELECTION; MODEL; COOPERATION; PERFORMANCE; PROJECTS; FIRMS;
D O I
10.1061/(ASCE)CO.1943-7862.0001588
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Selecting an appropriate joint venture contractor (JVC) is paramount to the success of large-scale infrastructure projects. The purpose of this paper is to develop a unified approach for JVC selection. The proposed approach integrates competitive information and collaborative information, focusing on the hesitant fuzzy variables of the bid evaluators. An optimization model is established based on the maximizing deviation (MD) principle to determine the criterion weights objectively. Then, the weights of the bid evaluators are obtained through calculating the relative closeness coefficients of each bid evaluator and the group from the JVCs to the fuzzy positive-ideal solution (FPIS). All the potential JVCs are ranked through minimizing the deviation model based on the fuzzy technique for order preference by similarity to ideal solution (TOPSIS) approach. A case study of the JVC selection process for the Hong Kong-Zhuhai-Macau Bridge (a large-scale island and tunnel engineering project) was conducted to illustrate the proposed approach. The results showed that, compared with the existing methods, the proposed method can select the contractors with good collaborative performance. This is important for the practice, because collaborative criteria are reflected in the key criteria currently used in JVC evaluation and selection. The findings from this study can help the JVC manager to identify a JVC with good collaborative performance and control the project risk from the initial stage.
引用
收藏
页数:15
相关论文
共 67 条
[1]   A NEW APPROACH FOR SUBCONTRACTOR SELECTION IN THE CONSTRUCTION INDUSTRY BASED ON PORTFOLIO THEORY [J].
Abbasianjahromi, Hamidreza ;
Rajaie, Hossein ;
Shakeri, Eghbal ;
Kazemi, Omid .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016, 22 (03) :346-356
[2]   A FRAMEWORK FOR SUBCONTRACTOR SELECTION IN THE CONSTRUCTION INDUSTRY [J].
Abbasianjahromi, Hamidreza ;
Rajaie, Hossein ;
Shakeri, Eqbal .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2013, 19 (02) :158-168
[3]   DEVELOPING A PROJECT PORTFOLIO SELECTION MODEL FOR CONTRACTOR FIRMS CONSIDERING THE RISK FACTOR [J].
Abbasianjahromi, Hamidreza ;
Rajaie, Hossein .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (06) :879-889
[4]   Application of Delphi expert panel in joint venture projects [J].
Adnan, H. ;
Rosman, M. R. ;
Rashid, Z. Z. Ahmad ;
Yusuwan, N. Mohamad ;
Bakhary, N. A. .
3RD INTERNATIONAL CONFERENCE ON RESEARCH METHODOLOGY FOR BUILT ENVIRONMENT AND ENGINEERING 2017, 2018, 117
[5]  
Adnan H, 2011, AFR J BUS MANAGE, V5, P5254
[7]   Construction Projects Bid or Not Bid Approach Using the Fuzzy Technique for Order Preference by Similarity FTOPSIS Method [J].
Al-Humaidi, H. M. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (12)
[8]  
[Anonymous], 1998, Journal of System Engineering and Electronics
[9]   Conceptual model of partnering and alliancing [J].
Anvuur, Aaron M. ;
Kumaraswamy, Mohan M. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (03) :225-234
[10]   INTUITIONISTIC FUZZY-SETS [J].
ATANASSOV, KT .
FUZZY SETS AND SYSTEMS, 1986, 20 (01) :87-96