Incorporating life cycle assessment eco-costs in the optimization of heat exchanger networks

被引:14
作者
Mano, Thiago B. [1 ]
Jimenez, Laureano [2 ]
Ravagnani, Mauro A. S. S. [1 ]
机构
[1] Univ Estadual Maringa, Chem Engn Dept, Colombo Av 5790, BR-87020900 Maringa, Parana, Brazil
[2] Univ Rovira & Virgili, Dept Engn Quim, Av Paisos Catalans 26, E-43007 Tarragona, Spain
关键词
Heat exchanger networks; Life cycle assessment; Eco-costs; Simultaneous optimization methods; DESIGN; PRODUCTS;
D O I
10.1016/j.jclepro.2017.06.154
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A substantial amount of research on heat exchanger networks (HEN) synthesis has concentrated on minimizing the total cost as unique criterion, thereby disregarding their negative environmental effects. In the present paper the external costs associated with the environmental impacts caused by energy generation and equipment construction were incorporated explicitly in the HEN synthesis task using the eco-costs methodology. The inclusion of the impact costs in the optimal synthesis of HEN was performed considering the most used fuels in chemical and petrochemical industries: hard coal, heavy and light fuel oil and natural gas. Boilers operating with each one of these fuels were considered, and three different technologies for boiler operating with natural gas were included (low NOx natural gas, modulating and non-modulating natural gas boilers). The influence of the impact assessment on total area, area cost and HEN cost were observed. Results show that the inclusion of indirect costs (externalities) in the optimization procedure can affect significantly the characteristics of the minimum cost design, the operational conditions and HEN topology. HEN operating with hard coal has the second lowest HEN cost, but the higher impact cost. Greenhouse gases and ecosystems impacts had the largest costs for all the cases considered. The HEN operating with heavy and light fuel oil have the highest HEN costs and the second and third total impact costs and this HEN may become less competitive when compared with cheaper fuels, due to its relatively high cost. HEN operating with natural gas is the most competitive alternative, since it has the lowest total impact cost and HEN area cost. For these fuels, results demonstrate that the reduction of total impact is affected more by the increase of the total area than by the utilities consumption. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1502 / 1517
页数:16
相关论文
共 22 条
  • [1] Multiobjective synthesis of heat exchanger networks minimizing the total annual cost and the environmental impact
    Anabel Lopez-Maldonado, Lizbeth
    Maria Ponce-Ortega, Jose
    Gabriel Segovia-Hernandez, Juan
    [J]. APPLIED THERMAL ENGINEERING, 2011, 31 (6-7) : 1099 - 1113
  • [2] Biegler L. T., 1997, SYSTEMATIC METHODS C
  • [3] Brunet R., 2012, APPL THERM ENG, V119, P189
  • [4] Eco-costs evaluation for the optimal design of buildings with lower environmental impact
    Carreras, Joan
    Boer, Dieter
    Cabeza, Luisa F.
    Jimenez, Laureano
    Guillen-Gosalbez, Gonzalo
    [J]. ENERGY AND BUILDINGS, 2016, 119 : 189 - 199
  • [5] A critical review and annotated bibliography for heat exchanger network synthesis in the 20th century
    Furman, KC
    Sahinidis, NV
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2002, 41 (10) : 2335 - 2370
  • [6] Gaudrel L., 2014, 3 STEPS RED TOT COST
  • [7] Goedkoop M., 2009, LIFE CYCLE IMPACT AS, P1
  • [8] Holme R., 2000, CORPORATE SOCIAL REP, V3, P2000
  • [9] Comparative life-cycle air emissions of coal, domestic natural gas, LNG, and SNG for electricity generation
    Jaramillo, Paulina
    Griffin, W. Michael
    Matthews, H. Scott
    [J]. ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2007, 41 (17) : 6290 - 6296
  • [10] System optimization for eco-design by using monetization of environmental impacts: a strategy to convert bi-objective to single-objective problems
    Lim, Seong-Rin
    Kim, Yoo Ri
    Woo, Seung H.
    Park, Donghee
    Park, Jong Moon
    [J]. JOURNAL OF CLEANER PRODUCTION, 2013, 39 : 303 - 311