New high power CW test facilities for ITER ICRH components testing

被引:17
作者
Bernard, J. M. [1 ]
Lombard, G. [1 ]
Argouarch, A. [1 ]
Chaix, J. P. [1 ]
Fejoz, P. [1 ]
Garibaldi, P. [1 ]
Hatchressian, J. C. [1 ]
Lebourg, P. [1 ]
Martinez, A. [1 ]
Mollard, P. [1 ]
Mougeolle, G. [1 ]
Noel, F. [1 ]
Saille, A. [1 ]
Samaille, F. [1 ]
Soler, B. [1 ]
Thouvenin, D. [1 ]
Volpe, D. [1 ]
Vulliez, K. [1 ]
机构
[1] IRFM, CEA, F-13108 St Paul Les Durance, France
关键词
ITER; ICRH; Test bed; Continuous wave;
D O I
10.1016/j.fusengdes.2011.02.100
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
First CW test bed, devoted for ion cyclotron resonance heating (ICRH), is being built at CEA Cadarache. It has been designed for testing the ICRH antenna sub assemblies under ITER relevant conditions (vacuum, cooling and RF). This paper presents a technical overview of these facilities and discusses their future operations in the framework of the ITER ICRH European R&D program. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:876 / 879
页数:4
相关论文
共 4 条
[1]  
[Anonymous], 2002, FUSION TECHNOL
[2]  
[Anonymous], 6500DW ITER PBS
[3]  
[Anonymous], 2006, NUCL FUSION, V46, pS500
[4]  
[Anonymous], SRD26PH ITER