Dynamic emergency inspection routing and restoration scheduling to enhance the post-earthquake resilience of a highway-bridge network

被引:25
|
作者
Zhang, Zhenyu [1 ,2 ,3 ]
Ji, Tingting [3 ]
Wei, Hsi-Hsien [3 ]
机构
[1] Zhejiang Univ, Dept Civil Engn, Hangzhou, Zhejiang, Peoples R China
[2] Hangzhou Commun Investment Grp CO LTD, Hangzhou, Peoples R China
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
关键词
Emergency disaster recovery; Dynamic scheduling; Transportation restoration scheduling; Transportation-network resilience; Seismic risk; SEISMIC RESILIENCE; SYSTEM; INFRASTRUCTURE; EARTHQUAKE; FRAMEWORK; MODELS; PERFORMANCE; SEARCH; REPAIR; TIMES;
D O I
10.1016/j.ress.2021.108282
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the immediate aftermath of earthquakes, effective scheduling of emergency restoration for transportation networks depends fundamentally on information about damage to those networks, which for the most part can only be acquired via a lengthy process of inspection. This paper proceeds from the insight that, rather than waiting to commence restoration activities until after all inspection activities are completed, damage information revealed gradually via inspection efforts could be incorporated into parallel scheduling of inspection routes and restoration schedules, allowing inspection and restoration to occur simultaneously, thus more efficiently boosting transportation networks' resilience. To achieve this, however, it will be necessary to understand the real-time interaction between inspection and restoration, as well as such interaction's impacts on the inspection-routing and restoration-scheduling process. Assuming that multiple inspection and restoration crews operate simultaneously and that their optimal routes and schedules are updated dynamically whenever additional inspection information is obtained, this study proposes an integer program for modeling inspection-routing and restoration-scheduling problems and determining the optimal inspection routes and restoration schedules for damaged highway-bridge networks, with the specific aim of maximizing a resilience measure, network travel time. The results of a case study using the proposed method and data from the 2008 Wenchuan Earthquake in China show that, as compared to a traditional inspection-restoration model, simultaneously performing and dynamically scheduling inspection and restoration can significantly boost networks' resilience.
引用
收藏
页数:22
相关论文
共 11 条
  • [1] Modeling Interaction of Emergency Inspection Routing and Restoration Scheduling for Postdisaster Resilience of Highway-Bridge Networks
    Zhang, Zhenyu
    Wei, Hsi-Hsien
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2021, 27 (01)
  • [2] Assessment of post-earthquake resilience of highway-bridge networks by considering downtime due to interaction of parallel restoration actions
    Zhang, Zhenyu
    Ji, Tingting
    Wei, Hsi-Hsien
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2023, 19 (05) : 589 - 605
  • [3] Resilience-based post-earthquake restoration scheduling for urban interdependent transportation-electric power network
    Zhang, Wangxin
    Han, Qiang
    Dong, Huihui
    Wen, Jianian
    Xu, Chengshun
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2024,
  • [4] Enhancing Buildings' Energy Resilience by Dynamic Seismic Emergency Inspection and Restoration Scheduling in Multiple Systems
    Zhang, Zhenyu
    Li, Shixian
    Chen, Aidi
    Jin, Xin
    Lan, Junjian
    Liu, Yuyao
    Wei, Hsi-Hsien
    BUILDINGS, 2023, 13 (10)
  • [5] Resilience assessment and optimization method of city road network in the post-earthquake emergency period
    Wang, Haoran
    Xiao, Jia
    Li, Shuang
    Zhai, Changhai
    EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2024, 23 (03) : 765 - 779
  • [6] Post-earthquake resilience assessment and long-term restoration prioritization of transportation network
    Wu, Yangyang
    Hou, Guangyang
    Chen, Suren
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 211
  • [7] ANALYSIS AND OPTIMIZATION OF POST-EARTHQUAKE RESTORATION PRIORITY OF BRIDGE NETWORK UPON FRAGMENTATION
    Yang G.-J.
    Mao J.-B.
    Tian L.
    Tang G.-W.
    Gongcheng Lixue/Engineering Mechanics, 2024, 41 (05): : 211 - 223
  • [8] A comprehensive approach in post-earthquake blockage prediction of urban road network and emergency resilience optimization
    Hosseini, Yaser
    Mohammadi, Reza Karami
    Yang, Tony Y.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 244
  • [9] A resilience-based decision framework for post-earthquake restoration of bridge networks under uncertainty
    Zhang, Wangxin
    Dong, Huihui
    Wen, Jianian
    Han, Qiang
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2025, 21 (02) : 341 - 356
  • [10] Resilience modeling and pre-hazard mitigation planning of transportation network to support post-earthquake emergency medical response
    Wu, Yangyang
    Chen, Suren
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 230