Building Information Modeling-Based Secondary Development System for 3D Modeling of Underground Pipelines

被引:9
作者
Chen, Jun [1 ]
Hu, Rao [2 ]
Guo, Xianfeng [3 ]
Wu, Feng [2 ]
机构
[1] Tongji Univ, Sch Ocean & Earth Sci, Shanghai 200092, Peoples R China
[2] Shanghai Survey & Design Inst Grp Co Ltd, Shanghai 200093, Peoples R China
[3] China Southwest Geotech Invest & Design Inst Co L, Chengdu, Peoples R China
来源
CMES-COMPUTER MODELING IN ENGINEERING & SCIENCES | 2020年 / 123卷 / 02期
关键词
Building information modeling; secondary development; underground pipeline; 3D modeling; visualization; BIM;
D O I
10.32604/cmes.2020.09180
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Underground pipeline networks constitute a major component of urban infrastructure, and thus, it is imperative to have an efficient mechanism to manage them. This study introduces a secondary development system to efficiently model underground pipeline networks, using the building information modeling (BIM)-based software Revit. The system comprises separate pipe point and tubulation models. Using a Revit application programming interface (API), the spatial position and attribute data of the pipe points are extracted from a pipeline database, and the corresponding tubulation data are extracted from a tubulation database. Using the Family class in Revit API, the cluster in the self-built library of pipe point is inserted into the spatial location and the attribute data is added; in the same way, all pipeline instances in the pipeline system are created. The extension and localization of the model accelerated the modeling speed. The system was then used in a real construction project. The expansion of the model database and rapid modeling made the application of BIM technology in three-dimensional visualization of underground pipeline networks more convenient. Furthermore, it has applications in pipeline engineering construction and management.
引用
收藏
页码:647 / 660
页数:14
相关论文
共 25 条
  • [1] Practical use of computational building information modeling in repairing and maintenance of hospital building- case study
    Akhoundan, Majid Reza
    Khademi, Kia
    Bahmanoo, Sam
    Wakil, Karzan
    Mohamad, Edy Tonnizam
    Khorami, Majid
    [J]. SMART STRUCTURES AND SYSTEMS, 2018, 22 (05) : 575 - 586
  • [2] [毕天平 Bi Tianping], 2014, [测绘通报, Bulletin of Surveying and Mapping], P93
  • [3] The project benefits of Building Information Modelling (BIM)
    Bryde, David
    Broquetas, Marti
    Volm, Juergen Marc
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (07) : 971 - 980
  • [4] Charef R., 2019, Journal of Building Engineering, V25, P1
  • [5] Beyond the third dimension of BIM: A systematic review of literature and assessment of professional views
    Charef, Rabia
    Alaka, Hafiz
    Emmitt, Stephen
    [J]. JOURNAL OF BUILDING ENGINEERING, 2018, 19 : 242 - 257
  • [6] Chen J., 2018, CHINESE J ENG GEOPHY, V15, P313
  • [7] Deke S., 2007, J BUILD INF MODEL, V1, P12
  • [8] BIM for construction safety improvement in Gaza strip: awareness, applications and barriers
    Enshassi, Adnan
    Ayyash, Abed
    Choudhry, Rafiq M.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2016, 16 (03) : 249 - 265
  • [9] Evaluating the Impact of Building Information Modeling on Project Performance
    Franz, Bryan
    Messner, John
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2019, 33 (03)
  • [10] Integrating construction process documentation into building information modeling
    Goedert, James D.
    Meadati, Pavan
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (07): : 509 - 516