A note on makespan minimization in proportionate flow shops

被引:4
|
作者
Choi, Byung-Cheon [2 ]
Leung, Joseph Y. -T. [1 ]
Pinedo, Michael L. [3 ]
机构
[1] New Jersey Inst Technol, Dept Comp Sci, Newark, NJ 07102 USA
[2] Chungnam Natl Univ, Dept Business, Taejon 305764, South Korea
[3] NYU, Dept Informat Operat & Management Sci, Stern Sch Business, New York, NY 10012 USA
基金
美国国家科学基金会;
关键词
Combinatorial problems; PROCESSING TIME MATRICES; SEQUENCING PROBLEM; COMPLETION-TIME; MACHINE;
D O I
10.1016/j.ipl.2010.10.016
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A study was conducted to demonstrate the process of makespan minimization in proportionate flow shops. The objective was to find a sequence for the n jobs that minimized the makespan, denoted by Cmax. It was assumed that job j had a processing requirement pj that affected the time job j spends on each one of the m machines. It was assumed that machine i had a characteristic value qi that affected the time each job spends on machine i. Models were considered where the time job j spends on machine i, pij was a given function of pj and qi. These models were regarded as proportionate flow shops with processing times that were machine dependent. It was demonstrated that the processing times of job j on all m machines were equal to pj in the proportionate flow shop environment. The proportionate flow shop model was also generalized by describing the processing time on each machine as a function of a processing requirement and a machine-dependent parameter.
引用
收藏
页码:77 / 81
页数:5
相关论文
共 50 条
  • [21] MINIMIZING THE EXPECTED MAKESPAN IN STOCHASTIC FLOW SHOPS
    PINEDO, M
    OPERATIONS RESEARCH, 1982, 30 (01) : 148 - 162
  • [22] Heuristic for no-wait flow shops with makespan minimization based on total idle-time increments
    XiaoPing Li
    Cheng Wu
    Science in China Series F: Information Sciences, 2008, 51
  • [23] Heuristic for no-wait flow shops with makespan minimization based on total idle-time increments
    Li XiaoPing
    Cheng, Wu
    SCIENCE IN CHINA SERIES F-INFORMATION SCIENCES, 2008, 51 (07): : 896 - 909
  • [24] Heuristic for no-wait flow shops with makespan minimization based on total idle-time increments
    LI XiaoPing1
    2 Key Laboratory of Computer Network and Information Integration (Southeast University)
    3 Department of Automation
    ScienceinChina(SeriesF:InformationSciences), 2008, (07) : 896 - 909
  • [25] A heuristic procedure for makespan minimization in job shops with multiple identical processors
    Sule, DR
    Vijayasundaram, K
    COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (3-4) : 399 - 402
  • [26] Scheduling proportionate flow shops with preventive machine maintenance
    Yu, Tae-Sun
    Han, Jun-Hee
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 231
  • [27] Meta-heuristic for no-wait job shops with makespan minimization
    Zhu, Jie
    Li, Xiaoping
    Zhang, Yi
    Wang, Qian
    PROCEEDINGS OF THE 2008 12TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS I AND II, 2008, : 874 - +
  • [28] Heuristic procedure for makespan minimization in job shops with multiple identical processors
    Sule, Dileep R.
    Vijayasundaram, Karthick
    Computers and Industrial Engineering, 1998, 35 (3-4): : 399 - 402
  • [29] Flow shops with machine maintenance: Ordered and proportionate cases
    Choi, Byung-Cheon
    Lee, Kangbok
    Leung, Joseph Y-T
    Pinedo, Michael L.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) : 97 - 104
  • [30] Batch scheduling in differentiation flow shops for makespan minimisation
    Huang, Ting-Chih
    Lin, Bertrand M. T.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (17) : 5073 - 5082