A note on makespan minimization in proportionate flow shops

被引:4
|
作者
Choi, Byung-Cheon [2 ]
Leung, Joseph Y. -T. [1 ]
Pinedo, Michael L. [3 ]
机构
[1] New Jersey Inst Technol, Dept Comp Sci, Newark, NJ 07102 USA
[2] Chungnam Natl Univ, Dept Business, Taejon 305764, South Korea
[3] NYU, Dept Informat Operat & Management Sci, Stern Sch Business, New York, NY 10012 USA
基金
美国国家科学基金会;
关键词
Combinatorial problems; PROCESSING TIME MATRICES; SEQUENCING PROBLEM; COMPLETION-TIME; MACHINE;
D O I
10.1016/j.ipl.2010.10.016
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A study was conducted to demonstrate the process of makespan minimization in proportionate flow shops. The objective was to find a sequence for the n jobs that minimized the makespan, denoted by Cmax. It was assumed that job j had a processing requirement pj that affected the time job j spends on each one of the m machines. It was assumed that machine i had a characteristic value qi that affected the time each job spends on machine i. Models were considered where the time job j spends on machine i, pij was a given function of pj and qi. These models were regarded as proportionate flow shops with processing times that were machine dependent. It was demonstrated that the processing times of job j on all m machines were equal to pj in the proportionate flow shop environment. The proportionate flow shop model was also generalized by describing the processing time on each machine as a function of a processing requirement and a machine-dependent parameter.
引用
收藏
页码:77 / 81
页数:5
相关论文
共 50 条
  • [1] A note on makespan minimization in two-stage flexible flow shops with uniform machines
    Kyparisis, George J.
    Koulamas, Christos
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 1321 - 1327
  • [2] Heuristic for no-wait flow shops with makespan minimization
    Li, Xiaoping
    Wang, Qian
    Wu, Cheng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (09) : 2519 - 2530
  • [3] A branch-and-bound algorithm for makespan minimization in differentiation flow shops
    Liu, Yen-Cheng
    Fang, Kuei-Tang
    Lin, Bertrand
    ENGINEERING OPTIMIZATION, 2013, 45 (12) : 1397 - 1408
  • [4] A new ant colony algorithm for makespan minimization in permutation flow shops
    Ahmadizar, Fardin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (02) : 355 - 361
  • [5] Lower Bounds for the Makespan Minimization in Job Shops
    Benziani, Yacine
    Kacem, Imed
    Laroche, Pierre
    Nagih, Anass
    2013 10TH IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2013, : 442 - 445
  • [6] Makespan minimization in no-wait flow shops: A polynomial time approximation scheme
    Sviridenko, M
    SIAM JOURNAL ON DISCRETE MATHEMATICS, 2003, 16 (02) : 313 - 322
  • [7] STOCHASTIC MINIMIZATION OF THE MAKESPAN IN FLOW SHOPS WITH IDENTICAL MACHINES AND BUFFERS OF ARBITRARY SIZE
    KIJIMA, M
    MAKIMOTO, N
    SHIRAKAWA, H
    OPERATIONS RESEARCH, 1990, 38 (05) : 924 - 928
  • [8] Makespan minimization in preemptive two machine job shops
    S. V. Sevastianov
    G. J. Woeginger
    Computing, 1998, 60 : 73 - 79
  • [9] Makespan minimization in preemptive two machine job shops
    Sevastianov, SV
    Woeginger, GJ
    COMPUTING, 1998, 60 (01) : 73 - 79
  • [10] Decomposition-based Makespan Minimization in Job Shops
    Morikawa, Katsumi
    Takahashi, Katsuhiko
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2005, 5 (01): : 32 - 38