Job rotation scheduling in the Seru system: shake enforced invasive weed optimization approach

被引:14
作者
Ayough, Ashkan [1 ]
Hosseinzadeh, Mohammad [2 ]
Motameni, Alireza [1 ]
机构
[1] Shahid Beheshti Univ, Fac Management & Accounting, Dept Ind Management, Tehran, Iran
[2] Iran Ctr Management Studies, Tehran, Iran
关键词
IWO algorithm; Job rotation scheduling; Lingo; 17; Seru production system; LINE-CELL CONVERSION; HUMAN-ROBOT COLLABORATION; ASSEMBLY-LINE; NUMERICAL-ANALYSIS; WORKER ASSIGNMENT; SATURATION; MANAGEMENT; ALGORITHM; MODEL;
D O I
10.1108/AA-07-2019-0126
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose Line-cell conversion and rotation of operators between cells are common in lean production systems. Thus, the purpose of this study is to provide an integrated look at these two practices through integrating job rotation scheduling and line-cell conversion problems, as well as investigating the effect of rotation frequency on flow time of a Seru system. Design/methodology/approach First, a nonlinear integer programming model of job rotation scheduling problem and line-cell conversion problem (Seru-JRSP) was presented. Then, because Seru-JRSP is NP-hard, an efficient and effective invasive weed optimization (IWO) algorithm was developed. Exploration process of IWO was enhanced by enforcing two shake mechanisms. Findings Computations of various sample problems showed shorter flow time and less number of assigned operators in a Seru system scheduled through job rotation. Also, nonlinear behavior of flow time versus number of rotation periods was shown. It was demonstrated that, setting number of rotation frequency to one in line with the literature leads to inferior flow time. In addition, ability of developed algorithm to generate clusters of equivalent solutions in terms of flow time was shown. Originality/value In this research, integration of job rotation scheduling and line-cell conversion problems was introduced, considering lack of an integrated look at these two practices in the literature. In addition, a new improved IWO equipped with shake enforcement was introduced.
引用
收藏
页码:461 / 474
页数:14
相关论文
共 58 条