共 19 条
[3]
Cheng TCE, 2000, NAV RES LOG, V47, P128, DOI 10.1002/(SICI)1520-6750(200003)47:2<128::AID-NAV4>3.0.CO
[4]
2-#
[5]
CHIN HN, 2005, IN PRESS OMEGA
[7]
Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
2004, 32 (02)
:121-129
[8]
Johnson Selmer Martin., 1954, NAV RES LOG, V1, P61, DOI [10.1002/(ISSN)1931-9193, DOI 10.1002/NAV.3800010110, 10.1002/nav.3800010110]