Chinese karst geology and measures to prevent geohazards during shield tunnelling in karst region with caves

被引:146
作者
Cui, Qing-Long [1 ]
Wu, Huai-Na [1 ]
Shen, Shui-Long [1 ]
Xu, Ye-Shuang [1 ]
Ye, Guan-Lin [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Civil Engn, State Key Lab Ocean Engn, Shanghai 200240, Peoples R China
关键词
Tunnelling in karst; Hazards; Karst cave treatment; Field trial; Settlement; CENTRAL-ISLAND TECHNIQUE; DEEP FOUNDATION PIT; LAND SUBSIDENCE; ROLLING CORRECTION; SOFT DEPOSITS; SHANGHAI; BEHAVIOR; CONSTRUCTION; PREDICTION; SYSTEM;
D O I
10.1007/s11069-014-1585-6
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Karst landscapes are widely distributed in China, and buried karst is widespread in Guangdong. This study mainly focuses on buried karst or karst caves which are underground at depths of up to 50 m and can significantly affect engineering construction activity. The karst caves, which are widely distributed in Guangdong Province, have the following features: high fissure water content, high rock permeability, prone to collapse, variable shapes, and irregular distribution. When a shield tunnel is constructed in this kind of environment, hazards, such as sink holes, the ingress of water or stones, and damage to the constructed tunnels may occur. Thus, karst caves need to be treated before tunnel construction. This paper presents a procedure for karst cave treatment to mitigate possible hazards during shield tunnelling in karst regions. The construction procedure includes field investigation, judgment, treatment, and effectiveness check. The treatment criteria, grouting material, construction steps, and effectiveness check for the karst cave treatment are introduced in detail. A field test on shield tunnelling excavation was conducted using the karst cave treatment in the karst region of Guangzhou, China. Field investigations include testing the unconfined compressive strength (UCS) of borehole samples of grouting materials, standard penetration test (SPT), core recovery (CR), ground surface settlement and building settlement. All of the UCS values of the borehole samples are greater than 0.2 MPa, the modified SPT values are more than ten, and the CR values are greater than 90 %. The measured values of ground surface settlement and building settlement are all within the allowable ranges. All of the test results demonstrate the applicability of this treatment process in karst regions.
引用
收藏
页码:129 / 152
页数:24
相关论文
共 35 条
  • [1] TBM tunnelling-induced settlements in coarse-grained soils: The case of the new Milan underground line 5
    Fargnoli, V.
    Boldini, D.
    Amorosi, A.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 38 : 336 - 347
  • [2] Guangzhou Metro Design & Research Institute Co. Ltd (GMDRI), 2010, GEN TECHN REQ KARST, V9
  • [3] Gui L, 2008, J GUILIN U TECHNOL, V28, P324
  • [4] Ju SJ, 2007, TUNN CONSTR, V27, P10
  • [5] Li L.P, 2009, THESIS SHANDONG U JI
  • [6] Research on risk assessment system for water inrush in the karst tunnel construction based on GIS: Case study on the diversion tunnel groups of the Jinping II Hydropower Station
    Li, Xueping
    Li, Yunan
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 40 : 182 - 191
  • [7] Analysis of shearing effect on tunnel induced by load transfer along longitudinal direction
    Liao, Shao-Ming
    Peng, Fang-Le
    Shen, Shul-Long
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2008, 23 (04) : 421 - 430
  • [8] Shield tunneling and environment protection in Shanghai soft ground
    Liao, Shao-Ming
    Liu, Jian-Hang
    Wang, Ru-Lu
    Li, Zhi-Ming
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2009, 24 (04) : 454 - 465
  • [9] Lu Y.R., 2010, CHINA KARST
  • [10] Ma L, 2014, HYDROGEOL J, V22, P371, DOI 10.1007/s10040-013-1068-y