Fuzzy Modeling Approaches for the Prediction of Machine Utilization in Hard Rock Tunnel Boring Machines

被引:0
|
作者
Simoes, Marcelo G. [1 ]
Kim, Taehong [2 ]
机构
[1] Colorado Sch Mines, Div Engn, Golden, CO 80401 USA
[2] Parsons Brinckerhoff Quade & Douglas Inc, Geotech & Tunneling, New York, NY 10119 USA
关键词
fuzzy; rock; mining; tunnel;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The main objective of this paper was to develop a TBM utilization predictor model by using fuzzy logic. Rule-based (Mamdani model) and parametric-based (Sugeno model) fuzzy logic were adapted to model subjective and unquantified TBM field data sets. A total of three hard TBM projects were studied to establish possible trends and correlations between rock mass properties and machine utilization. Since rock mass properties are the most affecting and unpredictable factors to machine utilization, only rock mass properties were focused and analyzed in this paper. The identification of input parameters includes: machine diameter, RMR, groundwater inflow rate, and RQD. These were used as input parameters influencing machine utilization level for both algorithms. In order to verify the validity of the two models, the predicted machine utilization level and the measured (or real) utilization level from the field records were compared. The Sugeno model was a more accurate estimator of machine utilization than Mamdani's, with a smoother resolution. By applying this utilization predictor model for the planning stage of TBM projects, a machine advance rate and corresponding total excavation time and cost can be estimated and be used as a useful tool for TBM project planning and bidding purpose.
引用
收藏
页码:947 / 954
页数:8
相关论文
共 50 条
  • [1] Experiences with hard rock tunnel boring machines: Performance prediction and cutter consumption
    Macias, Javier
    Revista de Obras Publicas, 2019, 166 (3612): : 76 - 83
  • [2] Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground
    Rostami, Jamal
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 173 - 182
  • [3] Dynamic modeling of gripper type hard rock tunnel boring machine
    Liao, Jianfeng
    Zhu, Xiaocong
    Yao, Bin
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 71 : 166 - 179
  • [4] A fuzzy logic model to predict the performance of hard rock tunnel boring machine
    Hedayatzadeh, M.
    Hamidi, J. Khademi
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1171 - 1178
  • [5] Assessment of Rock Drillability Prediction in Hard Rock Tunnel Boring
    Ivanicova, Lucia
    Labas, Milan
    Lazarova, Edita
    Feriancikova, Katarina
    Krulakova, Maria
    Krupa, Vit'azoslav
    PROCEEDINGS OF THE 2016 17TH INTERNATIONAL CARPATHIAN CONTROL CONFERENCE (ICCC), 2016, : 265 - 269
  • [6] Hard rock tunnel boring machines – State of the art 2020
    Flora M.
    Goliasch R.
    Strauss A.
    Atzori D.
    Geomechanik und Tunnelbau, 2019, 12 (06): : 721 - 729
  • [7] Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic
    Ebrahim Ghasemi
    Saffet Yagiz
    Mohammad Ataei
    Bulletin of Engineering Geology and the Environment, 2014, 73 : 23 - 35
  • [8] Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic
    Ghasemi, Ebrahim
    Yagiz, Saffet
    Ataei, Mohammad
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2014, 73 (01) : 23 - 35
  • [9] Evaluation of Hard Rock Tunnel Boring Machine (TBM) Performance Using Stochastic Modeling
    Peyman Jafarshirzad
    Ebrahim Ghasemi
    Saffet Yagiz
    Mohammad Hossein Kadkhodaei
    Geotechnical and Geological Engineering, 2023, 41 : 3513 - 3529
  • [10] Evaluation of Hard Rock Tunnel Boring Machine (TBM) Performance Using Stochastic Modeling
    Jafarshirzad, Peyman
    Ghasemi, Ebrahim
    Yagiz, Saffet
    Kadkhodaei, Mohammad Hossein
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (06) : 3513 - 3529