KULTURisk regional risk assessment methodology for water-related natural hazards - Part 2: Application to the Zurich case study

被引:27
|
作者
Ronco, P. [1 ,2 ]
Bullo, M. [1 ]
Torresan, S. [2 ]
Critto, A. [1 ,2 ]
Olschewski, R. [3 ]
Zappa, M. [4 ]
Marcomini, A. [1 ,2 ]
机构
[1] Univ Ca Foscari Venice, Dept Environm Sci Informat & Stat, Venice, Italy
[2] Euromediterranean Ctr Climate Change CMCC, Impacts Soil & Coast Div, Lecce, Italy
[3] Swiss Fed Res Inst WSL, Econ & Social Sci, Birmensdorf, Switzerland
[4] Swiss Fed Res Inst WSL, Mt Hydrol & Mass Movements, Birmensdorf, Switzerland
关键词
ECOLOGICAL RISK; FLOOD; SWITZERLAND; SYSTEM; VULNERABILITY; MANAGEMENT; SCALE;
D O I
10.5194/hess-19-1561-2015
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The aim of this paper is the application of the KULTURisk regional risk assessment (KR-RRA) methodology, presented in the companion paper (Part 1, Ronco et al., 2014), to the Sihl River basin, in northern Switzerland. Flood-related risks have been assessed for different receptors lying on the Sihl River valley including Zurich, which represents a typical case of river flooding in an urban area, by calibrating the methodology to the site-specific context and features. Risk maps and statistics have been developed using a 300-year return period scenario for six relevant targets exposed to flood risk: people; economic activities: buildings, infrastructure and agriculture; natural and semi-natural systems; and cultural heritage. Finally, the total risk index map has been produced to visualize the spatial pattern of flood risk within the target area and, therefore, to identify and rank areas and hotspots at risk by means of multi-criteria decision analysis (MCDA) tools. Through a tailored participatory approach, risk maps supplement the consideration of technical experts with the (essential) point of view of relevant stakeholders for the appraisal of the specific scores weighting for the different receptor-relative risks. The total risk maps obtained for the Sihl River case study are associated with the lower classes of risk. In general, higher (relative) risk scores are spatially concentrated in the deeply urbanized city centre and areas that lie just above to river course. Here, predicted injuries and potential fatalities are mainly due to high population density and to the presence of vulnerable people; flooded buildings are mainly classified as continuous and discontinuous urban fabric; flooded roads, pathways and railways, most of them in regards to the Zurich central station (Hauptbahnhof) are at high risk of inundation, causing severe indirect damage. Moreover, the risk pattern for agriculture, natural and semi-natural systems and cultural heritage is relatively less important mainly because the scattered presence of these assets. Finally, the application of the KR-RRA methodology to the Sihl River case study, as well as to several other sites across Europe (not presented here), has demonstrated its flexibility and the possible adaptation of it to different geographical and socioeconomic contexts, depending on data availability and particulars of the sites, and for other (hazard) scenarios.
引用
收藏
页码:1561 / 1576
页数:16
相关论文
共 50 条
  • [21] Biomonitoring of water and soil quality: a case study of ecotoxicological methodology application to the assessment of reclaimed agroindustrial wastewaters used for irrigation
    Maria Giulia Lionetto
    Roberto Caricato
    Antonio Calisi
    Maria Elena Giordano
    Elisa Erroi
    Trifone Schettino
    Rendiconti Lincei, 2016, 27 : 105 - 112
  • [22] How are leaf carbon- and water-related traits coordinated acclimation to elevated CO2 by its anatomy? A case study in tomato
    Du, Bin
    Ding, Risheng
    Yang, Xiaolin
    Du, Taisheng
    ENVIRONMENTAL AND EXPERIMENTAL BOTANY, 2022, 199
  • [23] Risk-informed assessment of regional preparedness: A case study of emergency potable water for hurricane response in Southeast Virginia
    Crowther, Kenneth G.
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURE PROTECTION, 2010, 3 (02) : 83 - 98
  • [24] Application of comprehensive prediction method of water inrush hazards induced by unfavourable geological body in high risk karst tunnel: a case study
    Shi, Shaoshuai
    Bu, Lin
    Li, Shucai
    Xiong, Ziming
    Xie, Xiaokun
    Li, Liping
    Zhou, Zongqing
    Xu, Zhenhao
    Ma, Dan
    GEOMATICS NATURAL HAZARDS & RISK, 2017, 8 (02) : 1407 - 1423
  • [25] Comparison between FLO-2D and Debris-2D on the Application of Assessment of Granular Debris Flow Hazards with Case Study
    WU Ying-Hsin
    LIU Ko-Fei
    CHEN Yi-Chin
    JournalofMountainScience, 2013, 10 (02) : 293 - 304
  • [26] Comparison between FLO-2D and Debris-2D on the application of assessment of granular debris flow hazards with case study
    Wu Ying-Hsin
    Liu Ko-Fei
    Chen Yi-Chin
    JOURNAL OF MOUNTAIN SCIENCE, 2013, 10 (02) : 293 - 304
  • [27] Comparison between FLO-2D and Debris-2D on the application of assessment of granular debris flow hazards with case study
    Ying-Hsin Wu
    Ko-Fei Liu
    Yi-Chin Chen
    Journal of Mountain Science, 2013, 10 : 293 - 304
  • [28] Geomatics, natural hazards and risk: spatial assessment of urban heatwave vulnerability of coupling adaptability based on BPNN model: a case study of Xiamen City, China
    Yang, Haifeng
    GEOMATICS NATURAL HAZARDS & RISK, 2021, 12 (01) : 2654 - 2675
  • [29] Monitoring networks — Way for improving risk assessment from natural and man-made hazards: Case study salt mine Provadia (NE Bulgaria)
    I. Paskaleva
    S. Nikolova
    L. Dimitrova
    G. Georgieva
    Acta Geodaetica et Geophysica Hungarica, 2010, 45 : 388 - 402
  • [30] Uncertainty health risk assessment and regional control of drinking water: a case study of Hanyuan County, southwest mountainous area, China
    Zhengjiang Lin
    Ying Liu
    Zhihui Cheng
    Rui Zhao
    Han Zhang
    Environmental Science and Pollution Research, 2022, 29 : 68202 - 68215