Total quality management implementation in the Egyptian construction industry

被引:19
作者
Elghamrawy, Tarek [1 ]
Shibayama, Tomoya [2 ]
机构
[1] Univ Illinois, Dept Civil & Environm Engn, Newmark Civil Engn Lab 3147, Urbana, IL 61801 USA
[2] Yokohama Natl Univ, Dept Civil Engn, Hodogaya Ku, Yokohama, Kanagawa 2408501, Japan
关键词
Construction industry; Egypt; Quality control;
D O I
10.1061/(ASCE)0742-597X(2008)24:3(156)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Total quality management (TQM) has been recognized as a successful management philosophy that can be successfully implemented in the construction industry. By examining the Japanese contractors working in Egypt and comparing their managing systems to the local ones, a comparative analysis of the two contractors working in the Egyptian field is presented in this paper to illustrate how TQM can be implemented effectively in the Egyptian construction industry. Bearing in mind the location bound nature of the production process, the competitive bidding, which emphasizes cost and the absence of the quality culture of the clients, subcontractors and site operatives are some of the constraining factors for implementing the quality policy. Based on the research findings, the paper presents some features of the Japanese construction industry that could be implemented in the Egyptian field in addition to a new model for TQM implementation that appropriates the Egyptian construction industry.
引用
收藏
页码:156 / 161
页数:6
相关论文
共 11 条
  • [1] Abbott, 1993, J MGMT ENG ASCE, V9, P340
  • [2] Quality improvement in Egypt: Methodology and implementation
    Abdel-Razek, RH
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (05): : 354 - 360
  • [3] ABDELRAZEK RH, 2000, THESIS ZAGAZIG U ZAG
  • [4] [Anonymous], INT J PROJECT MANAGE
  • [5] Anschutz E.E., 1995, TQM AM AM MOST SUCCE
  • [6] BURATI JL, 1993, J MGMT ENG ASCE, V9, P456, DOI DOI 10.1061/(ASCE)9742-597X(1993)9:4(456)
  • [7] KUPRENAS JA, 1996, PRACT PERIOD STRUCT, V1, P74
  • [8] MCCABE S, 1996, TQM MAGAZINE, V8, P14
  • [9] Implementing total quality management in construction firms
    Pheng, LS
    Teo, JA
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2004, 20 (01) : 8 - 15
  • [10] Robertson, 2000, INT J QUAL RELIAB MA, V17, P453, DOI DOI 10.1108/02656710010298526