Flood Control Capacity of the Three Gorges Project for Different Frequency Floods

被引:11
|
作者
Yan, Qiming [1 ]
Jing, Zhu [1 ]
Xia, Zhongxi [2 ]
Zhang, Shanghong [1 ]
机构
[1] North China Elect Power Univ, Sch Water Resources & Hydropower Engn, Beijing 102206, Peoples R China
[2] Power China Chengdu Engn Corp Ltd, Chengdu, Peoples R China
基金
中国国家自然科学基金;
关键词
catastrophic flood; flood control capacity; flood control scheduling; Jingjiang flood diversion area; Three Gorges Reservoir; DONGTING LAKE; DIVERSION; RESERVOIR; CHINA;
D O I
10.1089/ees.2021.0003
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
An accurate assessment of flood control capacity of a reservoir is a prerequisite for ensuring the safety of flood control works. This study used the method of adding side reservoirs and used MIKE11 to establish a one-dimensional hydrodynamic model of the Three Gorges Reservoir (TGR). Based on the combination of the dynamic reservoir capacity flood control and the separation of the outflow of the Jingjiang Three Outlets, the flood control capacity of the TGR was assessed. The results showed that the TGR can effectively withstand large floods below the magnitude of 100-year return period discharge. For a rare flood event in 1,000 years recurrence interval, it is necessary to use the Jingjiang flood diversion area for ensuring the safety of downstream floodplains along the main river course. As far as exceptionally large floods with the return frequency of 0.01% or lager magnitude concerned, this extreme high flow cannot be safely impounded by the TGR even if the Jingjiang flood diversion area is adopted. Therefore, a series of upstream cascade reservoirs are suggested to be fully utilized for a joint flood control strategy.
引用
收藏
页码:1195 / 1205
页数:11
相关论文
共 50 条
  • [1] Study of the flood control scheduling scheme for the Three Gorges Reservoir in a catastrophic flood
    Zhang, Shanghong
    Jing, Zhu
    Li, Wenda
    Yi, Yujun
    Zhao, Yong
    HYDROLOGICAL PROCESSES, 2018, 32 (11) : 1625 - 1634
  • [2] The dynamic capacity calculation method and the flood control ability of the Three Gorges Reservoir
    Zhang, Shanghong
    Jing, Zhu
    Yi, Yujun
    Wu, Yu
    Zhao, Yong
    JOURNAL OF HYDROLOGY, 2017, 555 : 361 - 370
  • [3] Effect of the Three Gorges Dam Project on flood control in the Dongting Lake area, China, in a 1998-type flood
    Hayashi, Seiji
    Murakami, Shogo
    Xu, Kai-Qin
    Watanabe, Masataka
    JOURNAL OF HYDRO-ENVIRONMENT RESEARCH, 2008, 2 (03) : 148 - 163
  • [4] Impact of the Three-Gorges Dam and water transfer project on Changjiang floods
    Nakayama, Tadanobu
    Shankman, David
    GLOBAL AND PLANETARY CHANGE, 2013, 100 : 38 - 50
  • [5] Comparison of nonstationary models in analyzing bivariate flood frequency at the Three Gorges Dam
    Zhang, Xu
    Duan, Kai
    Dong, Qianjin
    JOURNAL OF HYDROLOGY, 2019, 579
  • [6] Flood management selections for the Yangtze River midstream after the Three Gorges Project operation
    Fang, Hongwei
    Han, Dong
    He, Guojian
    Chen, Minghong
    JOURNAL OF HYDROLOGY, 2012, 432 : 1 - 11
  • [7] On Three Gorges Reservoir control water level and operating conditions in flood season
    Wang J.
    Guo S.
    Shuikexue Jinzhan/Advances in Water Science, 2020, 31 (04): : 473 - 480
  • [8] Flood-control ability of the Three Gorges Reservoir and upstream cascade reservoirs during catastrophic flooding
    Zhang S.
    Jing Z.
    An W.
    Zhang R.
    Yi Y.
    Zhongguo Kexue Jishu Kexue/Scientia Sinica Technologica, 2022, 52 (05): : 795 - 806
  • [9] Trend forecast for the influence of the Three Gorges project on the water environmental capacity of Dongting Lake
    Yang, Shijun
    Hu, Haiying
    Hao, Zhenchun
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 2454 - 2457
  • [10] The Political Economy of the Three Gorges Project
    Webber, Michael
    GEOGRAPHICAL RESEARCH, 2012, 50 (02) : 154 - 165