Qualitative Risk Assessment of Cybersecurity and Development of Vulnerability Enhancement Plans in Consideration of Digitalized Ship

被引:20
|
作者
Yoo, Yunja [1 ]
Park, Han-Seon [1 ]
机构
[1] Korea Maritime Inst, Maritime Safety Dept, Busan 49111, South Korea
关键词
cybersecurity; cyber threat; risk identification; risk matrix; risk assessment; MARITIME CYBERSECURITY;
D O I
10.3390/jmse9060565
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The International Maritime Organization (IMO) published the Guidelines on Maritime Cyber Risk Management in 2017 to strengthen cybersecurity in consideration of digitalized ships. As part of these guidelines, the IMO recommends that each flag state should integrate and manage matters regarding cyber risk in the ship safety management system (SMS) according to the International Safety Management Code (ISM Code) before the first annual verification that takes place on or after 1 January 2021. The purpose of this paper is to identify cybersecurity risk components in the maritime sector that should be managed by the SMS in 2021 and to derive priorities for vulnerability improvement plans through itemized risk assessment. To this end, qualitative risk assessment (RA) was carried out for administrative, technical, and physical security risk components based on industry and international standards, which were additionally presented in the IMO guidelines. Based on the risk matrix from the RA analysis results, a survey on improving cybersecurity vulnerabilities in the maritime sector was conducted, and the analytic hierarchy process was used to analyze the results and derive improvement plan priority measures.
引用
收藏
页数:14
相关论文
共 38 条
  • [11] Development of Minimum Criteria and Assessment of Sibutramine's Risk Minimization Plans
    Cruz, F. C. S.
    Bittencourt, M. O.
    Calado, G. S.
    de Sa, A. S.
    Gasparotto, F. S.
    Franca, L. F. S.
    DRUG SAFETY, 2012, 35 (10) : 948 - 948
  • [12] Co-development of vulnerability and risk assessment framework and methodology for Nepal
    Bimal Raj Regmi
    Regan Sapkota
    Apar Paudyal
    Dilip Kumar Gautam
    Rajan Thapa
    Rojy Joshi
    Smriti Shah
    Gita G.C.
    Bhogendra Mishra
    Environmental Monitoring and Assessment, 2023, 195
  • [13] Development of Seismic Risk Scenarios Based on a Hybrid Method of Vulnerability Assessment
    A. J. Kappos
    K. C. Stylianidis
    K. Pitilakis
    Natural Hazards, 1998, 17 : 177 - 192
  • [14] Co-development of vulnerability and risk assessment framework and methodology for Nepal
    Regmi, Bimal Raj
    Sapkota, Regan
    Paudyal, Apar
    Gautam, Dilip Kumar
    Thapa, Rajan
    Joshi, Rojy
    Shah, Smriti
    Gita, G. C.
    Mishra, Bhogendra
    ENVIRONMENTAL MONITORING AND ASSESSMENT, 2023, 195 (06)
  • [15] Development of seismic risk scenarios based on a hybrid method of vulnerability assessment
    Kappos, AJ
    Stylianidis, KC
    Pitilakis, K
    NATURAL HAZARDS, 1998, 17 (02) : 177 - 192
  • [16] VULNERABILITY ASSESSMENT AT RISK PROCESSES FROM THE PERSPECTIVE OF URBAN DEVELOPMENT OF FLORESTI, ROMANIA
    Breaban, Ana Ioana
    Iovanas, Eliza Ioana
    Gligor, Viorel
    INFORMATICS, GEOINFORMATICS AND REMOTE SENSING CONFERENCE PROCEEDINGS, SGEM 2016, VOL III, 2016, : 675 - 682
  • [17] Application in quantification of qualitative risk assessment (A case study of risk classification in satellite development)
    Mori Y.
    Sugimoto N.
    Nihon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 2010, 76 (764): : 1009 - 1016
  • [18] Development and validation of three-step risk assessment method for ship recycling sector
    Garmer, Karin
    Sjostrom, Hasse
    Hiremath, Anand M.
    Tilwankar, Atit K.
    Kinigalakis, George
    Asolekar, Shyam R.
    SAFETY SCIENCE, 2015, 76 : 175 - 189
  • [19] Risk Assessment of Water Resources Development Plans Using Fuzzy Fault Tree Analysis
    Abedzadeh, Saeedeh
    Roozbahani, Abbas
    Heidari, Ali
    WATER RESOURCES MANAGEMENT, 2020, 34 (08) : 2549 - 2569
  • [20] Risk Assessment of Water Resources Development Plans Using Fuzzy Fault Tree Analysis
    Saeedeh Abedzadeh
    Abbas Roozbahani
    Ali Heidari
    Water Resources Management, 2020, 34 : 2549 - 2569