Handling missing data for construction waste management: machine learning based on aggregated waste generation behaviors

被引:24
作者
Yang, Zhongze [1 ]
Xue, Fan [1 ]
Lu, Weisheng [1 ]
机构
[1] Univ Hong Kong, Dept Real Estate & Construct, Pokfulam, Hong Kong, Peoples R China
关键词
Construction waste management; Waste generation behavior; Missing data handling; Big data analytics; Machine learning; BIG DATA; CLASSIFICATION; IMPUTATION; PERFORMANCE; CHALLENGES; ANALYTICS; PATTERNS; INDUSTRY; NETWORK; TREES;
D O I
10.1016/j.resconrec.2021.105809
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the era of big data, data is increasingly driving the construction waste management (CWM) for minimizing the impacts on the environment and recycling construction materials. However, missing data, led by various information barriers, often undermines the decision-making and hinders effective CWM. This paper applies aggregated behavior-based Machine Learning (ML) methods to handling the project-level 'Missing Not At Random' (MNAR) data by using aggregated waste generation behaviors as a case study. First, we define a set of 821 waste generation behavioral features based on waste big data, then screen the indicative and decisive behaviors using automatic feature selection. Then, the most predictive ML method, trained via data of 2,451 construction projects in 2011-2016 in Hong Kong, is selected for handling the MNAR data. The experiments showed that the prediction of project missing data was satisfactory (validation F-1 = 0.87, test F-1 = 0.80). The contribution of this paper is to pinpoint the potential of waste big data in portraying project behaviors for more value-added applications, at the same time, to present a handling method for MNAR data that is automatic, fast, and low-cost from the CWM practitioner's perspective.
引用
收藏
页数:15
相关论文
共 93 条
[1]   Forecasting municipal solid waste generation using artificial intelligence modelling approaches [J].
Abbasi, Maryam ;
El Hanandeh, Ali .
WASTE MANAGEMENT, 2016, 56 :13-22
[2]  
Abidin NZ, 2018, INT J ADV COMPUT SC, V9, P442
[3]  
[Anonymous], 2017, PROJECT MANAGEMENT S
[4]  
[Anonymous], 2019, NONPARAMETRIC MULTIP
[5]  
atanabe S., 1985, PATTERN RECOGN
[6]   Editorial: stakeholder management in construction [J].
Atkin, Brian ;
Skitmore, Martin .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (06) :549-552
[7]   Behavioral determinants towards enhancing construction waste management: A Bayesian Network analysis [J].
Bakshan, Amal ;
Srour, Issam ;
Chehab, Ghassan ;
El-Fadel, Mutasem ;
Karaziwan, Jalal .
RESOURCES CONSERVATION AND RECYCLING, 2017, 117 :274-284
[8]   A decision-support framework for planning construction waste recycling: A case study of Shenzhen, China [J].
Bao, Zhikang ;
Lu, Weisheng .
JOURNAL OF CLEANER PRODUCTION, 2021, 309
[9]   Implementing on-site construction waste recycling in Hong Kong: Barriers and facilitators [J].
Bao, Zhikang ;
Lee, Wendy M. W. ;
Lu, Weisheng .
SCIENCE OF THE TOTAL ENVIRONMENT, 2020, 747
[10]   An introduction to modern missing data analyses [J].
Baraldi, Amanda N. ;
Enders, Craig K. .
JOURNAL OF SCHOOL PSYCHOLOGY, 2010, 48 (01) :5-37