Cogeneration planning under uncertainty Part I: Multiple time frame approach

被引:58
作者
Carpaneto, Enrico [1 ]
Chicco, Gianfranco [1 ]
Mancarella, Pierluigi [2 ]
Russo, Angela [1 ]
机构
[1] Politecn Torino, Dipartimento Ingn Elettr, I-10129 Turin, Italy
[2] Univ London Imperial Coll Sci Technol & Med, Dept Elect & Elect Engn, London SW7 2AZ, England
关键词
Cogeneration; Control strategies; Electricity and gas prices; Time frames; Probabilistic models; Uncertainty; ENERGY SUPPLY-SYSTEMS; INVESTMENT; GENERATION; RISK;
D O I
10.1016/j.apenergy.2010.10.014
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Cogeneration system planning spans a multi-year time interval and is affected by various sources of uncertainty, mainly depending on the evolution of energy loads and prices. The high level of uncertainty requires assessing the convenience of adopting predefined technological alternatives in different scenarios of variation of the uncertain variables. This paper introduces an original framework based on identifying the characteristics of small-scale and large-scale uncertainties, whereby a comprehensive approach based on multiple (long-, medium- and short-term) time frames is formulated. Medium-term time periods exhibiting small variations of both electrical and thermal load patterns are grouped together and represented through electrical/thermal load and electricity price correlated random variables (RVs). A Monte Carlo simulation of the cogeneration plant operation is carried out in the short-term by extracting the RVs for each group from multivariate Normal probability distributions. Multi-year scenarios in the long-term time frame are addressed in the companion paper (Part II). The proposed approach is applied to a real energy system. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1059 / 1067
页数:9
相关论文
共 30 条
[1]   Analysis of energy service systems in urban areas and their CO2 mitigations and economic impacts [J].
Aki, Hirohisa ;
Oyama, Tsutomu ;
Tsuji, Kiichiro .
APPLIED ENERGY, 2006, 83 (10) :1076-1088
[2]   Risk analysis for CHP decision making within the conditions of an open electricity market [J].
Al-Mansour, Fouad ;
Kozuh, Mitja .
ENERGY, 2007, 32 (10) :1905-1916
[3]  
[Anonymous], 1994, RELIABILITY EVALUATI
[4]  
*AUT EN EL GAS, 2009, DEL AUT EN EL GAS
[5]  
CARPANETO E, 2007, P IEEE POWERTECH 200
[6]   Cogeneration planning under uncertainty. Part II: Decision theory-based assessment of planning alternatives [J].
Carpaneto, Enrico ;
Chicco, Gianfranco ;
Mancarella, Pierluigi ;
Russo, Angela .
APPLIED ENERGY, 2011, 88 (04) :1075-1083
[7]   Managing market risk in energy [J].
Denton, M ;
Palmer, A ;
Masiello, R ;
Skantze, P .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (02) :494-502
[8]   Influences of thermal and electric load fluctuations in the cogeneration attractiveness [J].
Ernst, Mario A. Basulto ;
Balestieri, Jose A. Perrella .
APPLIED THERMAL ENGINEERING, 2006, 26 (14-15) :1500-1505
[9]   Wind speed simulation in wind farms for steady-state security assessment of electrical power systems [J].
Feijóo, AE ;
Cidrás, J ;
Dornelas, JLG .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 1999, 14 (04) :1582-1588
[10]   Optimal investment strategies in decentralized renewable power generation under uncertainty [J].
Fleten, S. -E. ;
Maribu, K. M. ;
Wangensteen, I. .
ENERGY, 2007, 32 (05) :803-815