DETERMINING THE REMAINING PRESTRESS FORCE IN A PRESTRESSED CONCRETE CROSSTIE

被引:0
作者
Scott, James D. [1 ]
Robertson, Aaron A. [2 ]
Peterman, Robert J. [1 ]
Beck, B. Terry [2 ]
Riding, Kyle A. [1 ]
Wu, John [3 ]
机构
[1] Kansas State Univ, CE Dept, Manhattan, KS 66506 USA
[2] Kansas State Univ, MNE Dept, Manhattan, KS 66506 USA
[3] Kansas State Univ, IMSE Dept, Manhattan, KS 66506 USA
来源
PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2017 | 2017年
关键词
TRANSFER LENGTH;
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The research presented herein focuses on determining the amount of internal prestressing force and bending resistance that is necessary to provide a durable long-term concrete railroad tie. In order to accomplish this, the researchers conducted a systematic evaluation of existing concrete ties that successfully withstood over 25 year's of service in track. An experimental method for determining the remaining prestress force in these existing prestressed concrete railroad ties is currently under development. The ties are first loaded in the upside-down orientation, with supports located at the rail seats, and two point loads applied at the center of the tie. A loading rate of 1,000 lb/min was used to initiate flexural cracking in the center of the tie. Once cracking was observed, the ties underwent 200 cycles of loading to reduce the friction between the prestressing tendons and the concrete. When the cycling was completed, the existing crack was instrumented with an extensometer to measure the Crack Opening Displacement (COD). The ties were loaded once more at 1,000 lb/min to develop a Load vs. COD relation. A systematic method of determining the load required to reopen the crack from the Load vs. COD relation is being developed using ties cast at a manufacturing plant that were instrumented with internal vibrating-wire strain gages. Using the load required to reopen the crack, along with the known crosssectional properties at the center of the tie, the remaining prestress force is calculated through equilibrium of forces. This method allows for the determination of the remaining prestress force in a member with known 'section properties to be obtained through load testing.
引用
收藏
页数:8
相关论文
共 49 条
  • [31] Evaluation of strand bond equations for prestressed members cast with self-consolidating concrete
    Floyd, Royce W.
    Howland, Michael B.
    Hale, W. Micah
    ENGINEERING STRUCTURES, 2011, 33 (10) : 2879 - 2887
  • [32] Time-dependent evolution of strand transfer length in pretensioned prestressed concrete members
    L. A. Caro
    J. R. Martí-Vargas
    P. Serna
    Mechanics of Time-Dependent Materials, 2013, 17 : 501 - 527
  • [33] Shear capacity of dry cast extruded precast, prestressed concrete hollow core slabs
    Truderung, Karl A.
    El-Ragaby, Amr
    Mady, Mohamed
    El-Salakawy, Ehab
    PCI JOURNAL, 2019, 64 (04): : 71 - 83
  • [34] Development and application of a hybrid prestressed segmental concrete girder utilizing low carbon materials
    Yang, Jun-Mo
    Kim, Jin-Kook
    STRUCTURAL ENGINEERING AND MECHANICS, 2019, 69 (04) : 371 - 381
  • [35] Transfer Length in Prestressed Self-Consolidating Concrete Box and I-Girders
    Pozolo, Andrew M.
    Andrawes, Bassem
    ACI STRUCTURAL JOURNAL, 2011, 108 (03) : 341 - 349
  • [36] Transfer stage parameters for concrete beams prestressed with BFRP bars: Experimental and finite element studies
    Motwani, Prashant
    Rather, Amer Iliyas
    Laskar, Arghadeep
    CONSTRUCTION AND BUILDING MATERIALS, 2022, 315
  • [37] Construction, strength, and driving performance of carbon-fiber-reinforced polymer prestressed concrete piles
    Rambo-Roddenberry, Michelle
    Joshi, Kunal
    Fallaha, Sam
    Herrera, Rodrigo
    Kampmann, Raphael
    Chipperfield, Jon
    Mtenga, Primus
    PCI JOURNAL, 2016, : 24 - 37
  • [38] Analysis of transfer length for prestressed FRP tendons in pretensioned concrete using composite beam theory
    Sha, Xin
    Davidson, James S.
    COMPOSITE STRUCTURES, 2019, 208 : 665 - 677
  • [39] CFRP prestressing for module bridges - Investigations on a 16 m carbon prestressed concrete beam with immediate bonding
    Bielak, Jan
    Will, Norbert
    Classen, Martin
    Schaarschmidt, David
    Flederer, Holger
    BETON- UND STAHLBETONBAU, 2025,
  • [40] Transfer and development length of high-strength duplex stainless steel strand in prestressed concrete piles
    Paul, Alvaro
    Gleich, Lorintz B.
    Kahn, Lawrence F.
    PCI JOURNAL, 2017, : 59 - 71