Integration of Planning, Scheduling, and Control for Multi-product Chemical Systems under Preventive Maintenance

被引:4
作者
Peng, Yanshuo [1 ]
Ricardez-Sandoval, Luis [1 ]
机构
[1] Univ Waterloo, Dept Chem Engn, Waterloo, ON N2L 3G1, Canada
关键词
Preventive Maintenance; Planning; Scheduling and Control; Flexible Planning Periods; MODELS;
D O I
10.1016/J.ifacol.2021.08.297
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This study presents a framework to perform simultaneous planning, scheduling, and control (iPSC) under preventive maintenance (PM) for multi -product continuous manufacturing units. PM is an essential part of the chemical industry as they provide robustness to the operation and minimize potential plant shutdowns. Flexible planning periods are also investigated in this work since they can improve process economics. A case study featuring a multi-product CSTR is presented to illustrate the benefits of the proposed framework. The results show that flexible planning periods can lead to considerable economic improvement compared to fixed planning periods. Also, an appropriate PM program combined with flexible planning periods provides the opportunity to optimize the maintenance time instead of fixing those times a priori using process heuristics. Copyright (C) 2021 The Authors.
引用
收藏
页码:536 / 541
页数:6
相关论文
共 10 条
[1]  
Camacho E. F., 2013, Advanced Textbooks in Control and Signal Processing, DOI DOI 10.23919/ECC51009.2020.9143671
[2]   Integrating preventive maintenance planning and production scheduling for a single machine [J].
Cassady, CR ;
Kutanoglu, E .
IEEE TRANSACTIONS ON RELIABILITY, 2005, 54 (02) :304-309
[3]   Closed-loop integration of planning, scheduling and multi-parametric nonlinear control [J].
Charitopoulos, Vassilis M. ;
Papageorgiou, Lazaros G. ;
Dua, Vivek .
COMPUTERS & CHEMICAL ENGINEERING, 2019, 122 :172-192
[4]   Traveling Salesman Problem-Based Integration of Planning, Scheduling, and Optimal Control for Continuous Processes [J].
Charitopoulos, Vassilis M. ;
Dua, Vivek ;
Papageorgiou, Lazaros G. .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2017, 56 (39) :11186-11205
[5]   Joint optimization of production, quality control and maintenance for serial-parallel multistage production systems [J].
Cheng, Guoqing ;
Li, Ling .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 204
[6]  
Dias L. S., 2020, COMPUTERS CHEM ENG, P134
[7]   Advances in mathematical programming models for enterprise-wide optimization [J].
Grossmann, Ignacio E. .
COMPUTERS & CHEMICAL ENGINEERING, 2012, 47 :2-18
[8]   New frontiers, challenges, and opportunities in integration of design and control for enterprise-wide sustainability [J].
Rafiei, Mina ;
Ricardez-Sandoval, Luis A. .
COMPUTERS & CHEMICAL ENGINEERING, 2020, 132
[9]   Maintenance models in warranty: A literature review [J].
Shafiee, Mahmood ;
Chukova, Stefanka .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 229 (03) :561-572
[10]   An integrated framework for scheduling and control using fast model predictive control [J].
Zhuge, Jinjun ;
Ierapetritou, Marianthi G. .
AICHE JOURNAL, 2015, 61 (10) :3304-3319