An integrated production and maintenance planning model with time windows and shortage cost

被引:73
作者
Najid, Najib M. [1 ]
Alaoui-Selsouli, Marouane [2 ]
Mohafid, Abdelmoula [3 ]
机构
[1] Univ Nantes, IRCCyN, IUT Nantes, Dep GMP, F-44475 Carquefou, France
[2] Univ Nantes, IRCCyN, Ecole Mines Nantes, F-44307 Nantes, France
[3] Univ Nantes, IRCCyN, IUT Nantes, Dep QLIO, F-44475 Carquefou, France
关键词
production management; production control; logistics; manufacturing control systems; manufacturing management; manufacturing processes; manufacturing strategy; materials management; bullwhip effect; supply chain management; LOT-SIZING PROBLEM; FAILING PRODUCTION UNIT; PREVENTIVE MAINTENANCE; PRODUCTION SYSTEM; INVENTORY; POLICIES; ALGORITHM; SIZE;
D O I
10.1080/00207541003620386
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we tackle the problem of integrating production and maintenance. The production problem addresses the issue of determining the production lot sizes of various items. Preventive maintenance is carried out in time windows to restore the production line to an 'as-good-as-new' status, and when a production line fails, a minimal repair is carried out to restore it to an 'as-bad-as-old' status. The resulting problem is modelled as a linear mixed-integer program. It takes into account demand shortage and the reliability of the production line. Computational experiments are carried out to show the effectiveness of the integrated model compared with a separate classical model for different instances, and the results obtained are analysed in detail.
引用
收藏
页码:2265 / 2283
页数:19
相关论文
共 44 条
[1]   The multi-item capacitated lot-sizing problem with setup times and shortage costs [J].
Absi, Nabil ;
Kedad-Sidhoum, Safia .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (03) :1351-1374
[2]   The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs [J].
Absi, Nabil ;
Kedad-Sidhoum, Safia .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (11) :2926-2936
[3]   An integrated production and preventive maintenance planning model [J].
Aghezzaf, E. H. ;
Jamali, M. A. ;
Ait-Kadi, D. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (02) :679-685
[4]   Integrated production planning and preventive maintenance in deteriorating production systems [J].
Aghezzaf, El-Houssaine ;
Najid, Najib M. .
INFORMATION SCIENCES, 2008, 178 (17) :3382-3392
[5]   The single-item lot-sizing problem with immediate lost sales [J].
Aksen, D ;
Altinkemer, K ;
Chand, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 147 (03) :558-566
[6]   THE DETERMINATION OF MAINTENANCE STRATEGIES FOR PLANTS SUBJECT TO BREAKDOWN [J].
BACKERT, W ;
RIPPIN, DWT .
COMPUTERS & CHEMICAL ENGINEERING, 1985, 9 (02) :113-126
[7]   STRONG FORMULATIONS FOR MULTI-ITEM CAPACITATED LOT SIZING [J].
BARANY, I ;
VANROY, TJ ;
WOLSEY, LA .
MANAGEMENT SCIENCE, 1984, 30 (10) :1255-1261
[8]  
Budai G., 2006, A review of planning models for maintenance and production. Economic Institute report
[9]  
Cassady C.R., 2001, J QUAL MAINT ENG, V7, P104
[10]   Optimal production, maintenance and lockout/tagout control policies in manufacturing systems [J].
Charlot, E. ;
Kenne, J. P. ;
Nadeau, S. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (02) :435-450