Extending BIM Interoperability for Real-Time Concrete Formwork Process Monitoring

被引:12
|
作者
Hamooni, Morteza [1 ]
Maghrebi, Mojtaba [2 ]
Sardroud, Javad Majrouhi [1 ]
Kim, Sungjin [3 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, Cent Tehran Branch, Tehran 1584743311, Iran
[2] Ferdowsi Univ Mashhad, Dept Civil Engn, Mashhad 9177948974, Razavi Khorasan, Iran
[3] Univ Alabama, Dept Civil Construct & Environm Engn, 401 7th Ave,264 Hardaway Hall,Box 870205, Tuscaloosa, AL 35487 USA
来源
APPLIED SCIENCES-BASEL | 2020年 / 10卷 / 03期
关键词
concrete formwork; concrete maturity; building information modeling (BIM); interoperability; real-time monitoring; ESTIMATE COMPRESSIVE STRENGTH; MATURITY METHOD; EARLY-AGE; TEMPERATURE; PERFORMANCE; PREDICTION;
D O I
10.3390/app10031085
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The concrete formwork process is a critical component of construction project control because failing to gain the necessary concrete strength can lead to reworks and, consequently, project delays and cost overruns during the project's execution. The goal of this study is to develop a novel method of monitoring the maturity of concrete and providing reduced formwork removal time with the strength ensured in real-time. This method addresses the wireless sensors and building information modeling (BIM) needed to help project management personnel monitor the concrete's status and efficiently decide on the appropriate formwork removal timing. Previous studies have focused only on the monitoring of concrete's status using sensor data or planning the formwork layout by integrating the BIM environment into the design process. This study contributes to extending BIM's interoperability for monitoring concrete's maturity in real-time during construction, as well as determining the formwork removal time for project control. A case study was conducted at a building construction project to validate the developed framework. It was concluded that BIM can interoperate with the data collected from sensors embedded in concrete, and that this system can reduce formwork removal time while retaining sufficient strength in the concrete, rather than adhering to the removal time given in building code standards.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] In-process, real-time monitoring of forming forces in rotary draw bending process
    He, Xu
    Welo, Torgeir
    Ma, Jun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2024, 134 (9-10) : 4651 - 4666
  • [2] Real-time Monitoring of Rebar Corrosion in Concrete
    He, Hongzhu
    Cui, Yuli
    Shi, Meilun
    NEW MATERIALS, APPLICATIONS AND PROCESSES, PTS 1-3, 2012, 399-401 : 1234 - 1240
  • [3] Real-time monitoring of early-age compressive strength of concrete using an IoT-enabled monitoring system: an investigative study
    Miller, Dane
    Ho, Nhat-Minh
    Talebian, Nima
    Javanbakht, Zia
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2023, 8 (02)
  • [4] IoT Enabled Real-Time Monitoring System for Early-Age Compressive Strength of Concrete
    John, Shemin T.
    Roy, Bijoy Krishna
    Sarkar, Pradip
    Davis, Robin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (02)
  • [5] Experimental research on remote real-time monitoring of concrete strength for highrise building machine during construction
    Zuo, Zibo
    Huang, Yulin
    Pan, Xi
    Zhan, Yijian
    Zhang, Longlong
    Li, Xinkui
    Zhu, Mintao
    Zhang, Lulu
    De Corte, Wouter
    MEASUREMENT, 2021, 178
  • [6] Design of real-time monitoring system on raw milk transport process
    Sun H.
    Jiang G.
    Kong Q.
    Chen Z.
    Li X.
    International Journal of Multimedia and Ubiquitous Engineering, 2016, 11 (04): : 335 - 342
  • [7] BIM-based Real-time Monitoring of the Equipment Maintenance of Property
    Sun, Chengshuang
    Che, Qian
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 2217 - 2221
  • [8] Real-time monitoring and prediction of compressive strength of mortar and concrete
    Kishore, S.
    Kumar, A. Arun
    MATERIALS RESEARCH EXPRESS, 2025, 12 (02)
  • [9] Real-time monitoring of asphalt mixture mixing process
    Chen Y.
    Ge L.-P.
    Song H.-S.
    Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2019, 19 (06): : 27 - 36
  • [10] Periodic performance prediction for real-time business process monitoring
    Kang, Bokyoung
    Kim, Dongsoo
    Kang, Suk-Ho
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2012, 112 (1-2) : 4 - 23