Time slack-based techniques for robust project scheduling subject to resource uncertainty

被引:107
作者
Lambrechts, Olivier [1 ]
Demeulemeester, Erik [1 ]
Herroelen, Willy [1 ]
机构
[1] Katholieke Univ Leuven, Res Ctr Operat Management, Dept Decis Sci & Informat Management, Fac Econ & Appl Econ, B-3000 Louvain, Belgium
关键词
Robust scheduling; Project scheduling; Resource breakdowns; Proactive; Time buffering; TRADE-OFF; STABILITY; CONSTRUCTION; MANAGEMENT;
D O I
10.1007/s10479-010-0777-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem (RCPSP) has been the subject of a great deal of research during the previous decades. This is not surprising given the high practical relevance of this scheduling problem. Nevertheless, extensions are needed to be able to cope with situations arising in practice such as multiple activity execution modes, activity duration changes and resource breakdowns. In this paper we analytically determine the impact of unexpected resource breakdowns on activity durations. Furthermore, using this information we develop an approach for inserting explicit idle time into the project schedule in order to protect it as well as possible from disruptions caused by resource unavailabilities. This strategy will be compared to a traditional simulation-based procedure and to a heuristic developed for the case of stochastic activity durations.
引用
收藏
页码:443 / 464
页数:22
相关论文
共 21 条
[1]  
[Anonymous], 2001, Operations Research Calculations Handbook
[2]  
ARTIGUES C, 2000, EUR J OPER RES, V127, P294
[3]  
Barlow R.E., 1996, MATH THEORY RELIABIL
[4]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[5]   Proactive heuristic procedures for robust project scheduling: An experimental analysis [J].
de Vonder, Stijn Van ;
Demeulemeester, Erik ;
Herroelen, Willy .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :723-733
[6]  
Demeulemeester E.L., 2002, Project Scheduling : a Research Handbook. (49), V49
[7]   Resource-constrained project scheduling: A survey of recent developments [J].
Herroelen, W ;
De Reyck, B ;
Demeulemeester, E .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (04) :279-302
[8]   The construction of stable project baseline schedules [J].
Herroelen, W ;
Leus, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) :550-565
[9]   PSPLIB - A project scheduling problem library [J].
Kolisch, R ;
Sprecher, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 96 (01) :205-216
[10]  
LAMBRECHTS O, 2007, KBI0702 KU LEUV DEP