Robotic replacement for disc cutters in tunnel boring machines

被引:26
作者
Du, Liang [1 ,2 ]
Yuan, Jianjun [1 ,2 ,3 ]
Bao, Sheng [1 ,2 ]
Guan, Renming [4 ]
Wan, Weiwei [5 ]
机构
[1] Shanghai Univ, Shanghai Robot Inst, Sch Mechatron Engn & Automation, Shanghai 200444, Peoples R China
[2] Shanghai Univ, Shanghai Key Lab Intelligent Mfg & Robot, Shanghai 200444, Peoples R China
[3] Shanghai Robot Ind Technol Res Inst Co Ltd, Shanghai 200063, Peoples R China
[4] Dimens X Robot Technol Co Ltd, Jiaxing 314299, Zhejiang, Peoples R China
[5] Osaka Univ, Grad Sch Engn Sci, Toyonaka, Osaka 5608531, Japan
关键词
Construction robots; Manipulators; End effectors; Automatic disc cutter replacement; HARD-ROCK TBM; DESIGN; OPTIMIZATION; INTERVENTION; MANIPULATION; WEAR;
D O I
10.1016/j.autcon.2022.104369
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Disc cutters are representative cutting tools in tunnel boring machines (TBMs). They are installed at the cutter head of the TBM to disintegrate rocks during tunnel boring. Disc cutters require regular replacement to avoid wear and malfunctions. Currently, most replacement work is performed manually, with intensive labor requirements and hazardous working conditions. To solve these problems, we proposed a robotic solution for disc cutter replacement in a widely used TBM. We used a novel eccentric-locking mechanism to simplify the disc cutter installation and developed a robotic manipulator with high dexterity and a high payload capacity for moving heavy disc cutters within the highly constrained TBM chambers. The proposed system can be operated through a specially designed teleoperation platform, either manually or semi-autonomously. We fabricated and tested a prototype in a laboratory environment and applied it to a real TBM. The results confirm the effectiveness and efficiency of the robotic solution.
引用
收藏
页数:14
相关论文
共 57 条
[1]  
Adati H., 2009, REPORT TAISEI TECHNO, V42, P1
[2]  
Pham AD, 2018, INT J PR ENG MAN-GT, V5, P519
[3]  
[Anonymous], 2007, Robot Grippers
[4]  
[Anonymous], 1998, 9283 DIN EN ISO
[5]   The future of construction automation: Technological disruption and the upcoming ubiquity of robotics [J].
Bock, Thomas .
AUTOMATION IN CONSTRUCTION, 2015, 59 :113-121
[6]   Kinematic Design Method for Rail-Guided Robotic Arms [J].
Borgerink, Dian J. ;
Brouwer, Dannis M. ;
Stegenga, Jan ;
Stramigioli, Stefano .
JOURNAL OF MECHANISMS AND ROBOTICS-TRANSACTIONS OF THE ASME, 2017, 9 (01)
[7]  
Bruland A., 2000, Hard Rock Tunnel Boring
[8]  
Camus T., 2015, ISARC, V32, P1
[9]   Robot-based construction automation: An application to steel beam assembly (Part I) [J].
Chu, Baeksuk ;
Jung, Kyoungmo ;
Lim, Myo-Taeg ;
Hong, Daehie .
AUTOMATION IN CONSTRUCTION, 2013, 32 :46-61
[10]   Assessing maintenance strategies for cutting tool replacements in mechanized tunneling using process simulation [J].
Conrads, Alena ;
Scheffer, Markus ;
Mattern, Hannah ;
Koenig, Markus ;
Thewes, Markus .
JOURNAL OF SIMULATION, 2017, 11 (01) :51-61