Using simulation for process reengineering in refractory ceramics manufacturing-a case study

被引:7
作者
Balan, Srinivasan [1 ]
机构
[1] Natl Inst Ind Engn, Bombay, Maharashtra, India
关键词
Simulation; Process reengineering; Order fulfillment lead time; Cycle time; COMPUTER-SIMULATION; MULTIRESPONSE PROBLEMS; TAGUCHI METHOD; OPTIMIZATION; PERFORMANCE; SYSTEMS; DESIGN;
D O I
10.1007/s00170-017-0602-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper deals with the simulation study carried out to solve bottleneck operations using manufacturing process reengineering. The study was carried out in a ceramic fiber products manufacturing company that deals with heat insulation solutions. The study mainly concentrates on the current capacity of facilities and delay in the manufacturing lead time in order to meet the order fulfillment lead time (OFLT). A simulation model was developed for the current scenario, and all the necessary performance measures were analyzed in order to propose changes in the process. It was found that the facilities had huge cycle time to process the products to the next stage, which created huge delays in meeting the OFLT. The outcome of the simulation was taken into account by the decision makers and recommendations implemented for the retro fitment of existing facilities. Using process reengineering, the proposed changes in the manufacturing line yielded 50% reduction in cycle time and manufacturing lead time (MLT) was reduced to 1.5 from 3 days.
引用
收藏
页码:1761 / 1770
页数:10
相关论文
共 35 条
[1]  
Aju PT, 2013, INT J EMERG TECHNOL, V3, P148
[2]  
[Anonymous], 2014, THESIS
[3]  
Banks J., 2009, PRENTICE HALL INT SE
[4]   The use of simulation modeling and factorial analysis as a method for process flow improvement [J].
Callahan, RN ;
Hubbard, KM ;
Bacoski, NM .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (1-2) :202-208
[5]   Application of computer simulation to the design of a traffic signal timer [J].
Chou, CY ;
Chen, CH ;
Li, MHC .
COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 39 (1-2) :81-94
[6]   Simulation using GPSS/H [J].
Crain, RC .
PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE, 1997, :567-573
[7]   The impacts of component commonality on integrated supply chain network performance: a state and resource-based simulation study [J].
Dong, M ;
Chen, FF .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 27 (3-4) :397-406
[8]   Integrating computer-aided modeling and micro-simulation in multi-criteria evaluation of service infrastructure assignment approaches [J].
Duran, Alfonso ;
Garcia, Isabel ;
Gutierrez, Miguel .
JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2013, 6 (03) :796-804
[9]  
Faisal KP, 2015, INT J SCI RES PUBL, V5, P1
[10]  
Farsijani H., 2013, International Journal of Advanced Design and Manufacturing Technology, V6, P87