Optimized depth of transition from Open Pit to underground coal mining

被引:15
|
作者
Ordin, A. A. [1 ]
Vasil'ev, I. V. [1 ]
机构
[1] Russian Acad Sci, Chinakal Inst Min, Siberian Branch, Novosibirsk 630091, Russia
关键词
Dynamic programming; lag factor; optimization; transition depth; open pit and underground mining; DESIGN;
D O I
10.1134/S1062739114040103
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
The article formulates the problem on optimization of depth for transition from open pit to underground coal mining, considering lag factor. The main regularities are presented together with the numerical calculation of the set problem in terms of the Raspadsky Open Pit Mine using the dynamic programming method.
引用
收藏
页码:696 / 706
页数:11
相关论文
共 50 条
  • [1] Optimized depth of transition from Open Pit to underground coal mining
    A. A. Ordin
    I. V. Vasil’ev
    Journal of Mining Science, 2014, 50 : 696 - 706
  • [2] NUMERICAL MODELING OF OPEN PIT (OP) TO UNDERGROUND (UG) TRANSITION IN COAL MINING
    Phu Minh Vuong Nguyen
    Niedbalski, Zbigniew
    STUDIA GEOTECHNICA ET MECHANICA, 2016, 38 (03) : 35 - 48
  • [3] Transition from open cut to underground coal mining
    Hayes, P
    MINDEV 97 - THE INTERNATIONAL CONFERENCE ON MINE PROJECT DEVELOPMENT, 1997, 97 (07): : 73 - 78
  • [4] Optimal mining model of transition from open-pit to underground mining
    Wang, Xin-Min
    Zhao, Jian-Wen
    Zhang, Qin-Li
    Wu, Peng
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2012, 43 (04): : 1434 - 1439
  • [5] Combined optimisation of an open-pit mine outline and the transition depth to underground mining
    Whittle, D.
    Brazil, M.
    Grossman, P. A.
    Rubinstein, J. H.
    Thomas, D. A.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 268 (02) : 624 - 634
  • [6] Stability of boundary pillars in transition from open pit to underground mining
    Xing-dong Zhao
    Lian-chong Li
    Chun-an Tang
    Hong-xun Zhang
    Journal of Central South University, 2012, 19 : 3256 - 3265
  • [7] Stability of boundary pillars in transition from open pit to underground mining
    赵兴东
    李连崇
    唐春安
    张洪训
    JournalofCentralSouthUniversity, 2012, 19 (11) : 3256 - 3265
  • [8] A stochastic optimization formulation for the transition from open pit to underground mining
    James A. L. MacNeil
    Roussos G. Dimitrakopoulos
    Optimization and Engineering, 2017, 18 : 793 - 813
  • [9] Stability of boundary pillars in transition from open pit to underground mining
    Zhao Xing-dong
    Li Lian-chong
    Tang Chun-an
    Zhang Hong-xun
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2012, 19 (11) : 3256 - 3265
  • [10] An Uncertainty-based Transition from Open Pit to Underground Mining
    Khaboushan, A. Soltani
    Osanloo, M.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2019, 32 (08): : 1218 - 1224