Assembly line balancing and activity scheduling for customised products manufacturing

被引:4
作者
Pilati, Francesco [1 ]
Lelli, Giovanni [2 ]
Regattieri, Alberto [2 ]
Ferrari, Emilio [2 ]
机构
[1] Univ Trento, Dept Ind Engn, Via Sommar 9, I-38123 Trento, Italy
[2] Univ Bologna, Dept Ind Engn, Viale Risorgimento 2, I-40136 Bologna, Italy
关键词
Assembly line balancing; Activity scheduling; Customized production; Product accessory; Clustering; MODEL; METHODOLOGY; DESIGN; OPTIMIZATION; REDUCTION; COMPANY; SYSTEMS; TIME;
D O I
10.1007/s00170-022-08953-3
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Nowadays, end customers require personalized products to match their specific needs. Thus, production systems must be extremely flexible. Companies typically exploit assembly lines to manufacture produces in great volumes. The development of assembly lines distinguished by mixed or multi models increases their flexibility concerning the number of product variants able to be manufactured. However, few scientific contributions deal with customizable products, i.e., produces which can be designed and ordered requiring or not a large set of available accessories. This manuscript proposes an original two-step procedure to deal with the multi-manned assembly lines for customized product manufacturing. The first step of the procedure groups the accessories together in clusters according to a specific similarity index. The accessories belonging to a cluster are typically requested together by customers and necessitate a significant mounting time. Thus, this procedure aims to split accessories belonging to the same cluster to different assembly operators avoiding their overloads. The second procedure step consists of an innovative optimization model which defines tasks and accessory assignment to operators. Furthermore, the developed model defines the activity time schedule in compliance with the task precedencies maximizing the operator workload balance. An industrial case study is adopted to test and validate the proposed procedure. The obtained results suggest superior balancing of such assembly lines, with an average worker utilization rate greater than 90%. Furthermore, in the worst case scenario in terms of customer accessories requirement, just 4 line operators out of 16 are distinguished by a maximum workload greater than the cycle time.
引用
收藏
页码:3925 / 3946
页数:22
相关论文
共 44 条
  • [1] Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds
    Amen, M
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) : 747 - 770
  • [2] Assembly system design in the Industry 4.0 era: a general framework
    Bortolini, Marco
    Ferrari, Emilio
    Gamberi, Mauro
    Pilati, Francesco
    Faccio, Maurizio
    [J]. IFAC PAPERSONLINE, 2017, 50 (01): : 5700 - 5705
  • [3] Multi-objective assembly line balancing considering component picking and ergonomic risk
    Bortolini, Marco
    Faccio, Maurizio
    Gamberi, Mauro
    Pilati, Francesco
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 : 348 - 367
  • [4] Assembly line balancing: Which model to use when?
    Boysen, Nils
    Fliedner, Malte
    Scholl, Armin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) : 509 - 528
  • [5] A classification of assembly line balancing problems
    Boysen, Nils
    Fliedner, Malte
    Scholl, Armin
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (02) : 674 - 693
  • [6] An optimization methodology for multi model walking-worker assembly systems: an application from busbar energy distribution systems
    Cevikcan, Emre
    [J]. ASSEMBLY AUTOMATION, 2016, 36 (04) : 439 - 459
  • [7] Assembly systems in Industry 4.0 era: a road map to understand Assembly 4.0
    Cohen, Yuval
    Naseraldin, Hussein
    Chaudhuri, Atanu
    Pilati, Francesco
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 105 (09) : 4037 - 4054
  • [8] Product variety management
    ElMaraghy, H.
    Schuh, G.
    ElMaraghy, W.
    Piller, F.
    Schoensleben, P.
    Tseng, M.
    Bernard, A.
    [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2013, 62 (02) : 629 - 652
  • [9] The type E simple assembly line balancing problem: A mixed integer linear programming formulation
    Esmaeilbeigi, Rasul
    Naderi, Bahman
    Charkhgard, Parisa
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2015, 64 : 168 - 177
  • [10] A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Fattahi, Parviz
    Roshani, Abdolreza
    Roshani, Abdolhassan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (1-4) : 363 - 378