Inefficiencies in Norwegian small-scale construction, or the problem of too long trucks?

被引:4
作者
Eivindson, Espen [1 ]
Innvaer, Berner E. [1 ]
Kolberg, Elisabeth [1 ]
Merschbrock, Christoph [1 ,2 ]
Rolfsen, Christian Nordahl [1 ]
机构
[1] Oslo & Akershus Univ Coll, POB 4, NO-0130 Oslo, Norway
[2] Jonkjopimg Univ, POB 1026,Gjuterigatan 5, SE-55111 Jonkoping, Sweden
来源
CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017 | 2017年 / 196卷
关键词
Muda; lean; SME; residential construction; construction management;
D O I
10.1016/j.proeng.2017.08.028
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
"When the truck arrived at the construction site it could not unload the material because it [the truck] was too long, we had to send it away [.], this happens all the time in Oslo where we have to build on very small plots." (Carpenter, Oslo). As the quote illustrates, inefficiencies and resulting low productivity remain a challenge for today's small construction businesses. While the reasons for inefficiencies are not completely understood, various techniques for project planning and control have proven their practical value in mitigating them. Lean construction has been articulated as one of the concepts that can solve inefficiency problems. The national initiative "Lean construction Norway" initiated by government, academia, and industry, seeks to diffuse lean production principles in the construction industry. However, small to medium sized contractors remain largely excluded from the innovative practices. This article sets out to study what a small Norwegian contractor enforcing lean concepts in addressing construction inefficiencies may gain. Ingrained in the concept of muda we exemplify waste related to waiting, overproduction, defects, inventory, motion, over processing, and transporting. We ran a case study in a small industry standard type of residential project executed by a small contractor. Data were collected based on a series of qualitative interviews conducted with the on-site personnel. The findings illustrate a variety of inefficiencies resulting in low productivity. We expect that management inspired by lean principles in conjunction with modern planning methods such as building information modelling may improve project delivery in Norwegian small-scale construction.(c) 2017 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:543 / 549
页数:7
相关论文
共 15 条
[1]  
[Anonymous], J INFORM TECHNOLOGY
[2]   THE CASE RESEARCH STRATEGY IN STUDIES OF INFORMATION-SYSTEMS [J].
BENBASAT, I ;
GOLDSTEIN, DK ;
MEAD, M .
MIS QUARTERLY, 1987, 11 (03) :369-386
[3]  
Bertelsen S., 2003, IGLC-11
[4]  
De Mente B, 2004, JAPANS CULTURAL CODE, P197
[5]  
Eastman C, 2011, BIM HDB, P10
[6]  
Kato I., 2011, Toyota Kaizen Methods: Six Steps to Improvement
[7]  
Kenkyusa, 2003, KENK NEW JAP ENGL DI, P2530
[8]  
Koskela L., 1993, 1 WORKSH LEAN CONSTR
[9]  
Langleo J. A., 2013, MALING PRODUKTIVITET, P7
[10]  
Merschbrock C., 2016, J INFORM TECHNOLOGY, V21