Personnel tour scheduling when starting-time restrictions are present

被引:50
作者
Brusco, MJ [1 ]
Jacobs, LW
机构
[1] Florida State Univ, Coll Business, Informat & Management Sci Dept, Tallahassee, FL 32306 USA
[2] No Illinois Univ, Operat Management & Informat Syst Dept, De Kalb, IL 60115 USA
关键词
workforce scheduling; linear programming; heuristics;
D O I
10.1287/mnsc.44.4.534
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This payer presents an effective solution strategy for an important category of personnel scheduling problems. Specifically, we address the restricted starting-time tour-scheduling problem (RSTP), which involves the determination of the hours of the day (shifts) and days of the week (days on) that employees are assigned to work. RSTP is characterized by restrictions on the number of daily time periods in which employees may begin their shifts. Moreover, the RSTP we consider contains constraints that require separation of starting times. Such restrictions are widely encountered in practice and are based on a number of factors including managerial concerns for control of employee movements, union contractual obligations, and employee preferences for common shift starting times. A two-stage heuristic solution strategy is proposed for RSTP. We developed eight heuristic procedures based on this strategy and applied them to four sets of labor requirements, for each of 27 United Airlines (UA) airport ground stations. One of the best of these procedures yielded solution costs that averaged only 1.36 full-time-equivalent employees above very conservative LP-based lower bounds. Moreover, the solution costs obtained using this procedure were, on average, 28 percent closer to the lower bounds than solution costs obtained using UA's current scheduling system. We conclude that the two-stage heuristic solution strategy is a valuable platform from which to develop procedures for generating near-optimal solutions to this difficult class of personnel scheduling problems.
引用
收藏
页码:534 / 547
页数:14
相关论文
共 52 条
[1]   LL-BEAN, CHOOSES A TELEPHONE AGENT SCHEDULING SYSTEM [J].
ANDREWS, BH ;
PARSONS, HL .
INTERFACES, 1989, 19 (06) :1-9
[2]  
[Anonymous], 1976, DECIS SCI, DOI DOI 10.1111/J.1540-5915.1976.TB00706.X
[3]   INTEGRATED DAYS OFF AND SHIFT PERSONNEL SCHEDULING [J].
BAILEY, J .
COMPUTERS & INDUSTRIAL ENGINEERING, 1985, 9 (04) :395-404
[4]  
Bailey J., 1985, J OPERATIONS MANAGEM, V5, P327
[5]   SCHEDULING A FULL-TIME WORKFORCE TO MEET CYCLIC STAFFING REQUIREMENTS [J].
BAKER, KR .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (12) :1561-1568
[6]   WORKFORCE ALLOCATION IN CYCLICAL SCHEDULING PROBLEMS - SURVEY [J].
BAKER, KR .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (01) :155-167
[7]   WORKFORCE SCHEDULING WITH CYCLIC DEMANDS AND DAY-OFF CONSTRAINTS [J].
BAKER, KR ;
MAGAZINE, MJ .
MANAGEMENT SCIENCE, 1977, 24 (02) :161-167
[8]  
BAKER KR, 1979, AIIE T, V11, P286, DOI 10.1080/05695557908974473
[9]   CYCLIC SCHEDULING VIA INTEGER PROGRAMS WITH CIRCULAR ONES [J].
BARTHOLDI, JJ ;
ORLIN, JB ;
RATLIFF, HD .
OPERATIONS RESEARCH, 1980, 28 (05) :1074-1085
[10]   A GUARANTEED-ACCURACY ROUND-OFF ALGORITHM FOR CYCLIC SCHEDULING AND SET COVERING [J].
BARTHOLDI, JJ .
OPERATIONS RESEARCH, 1981, 29 (03) :501-510