An updated survey of variants and extensions of the resource-constrained project scheduling problem *

被引:158
作者
Hartmann, Sonke [1 ]
Briskorn, Dirk [2 ]
机构
[1] HSBA Hamburg Sch Business Adm, Willy Brandt Str 75, D-20459 Hamburg, Germany
[2] Berg Univ Wuppertal, Lehrstuhl Prod & Logist, D-42119 Wuppertal, Germany
关键词
Project scheduling; Resource constraints; Temporal constraints; Networks; NET PRESENT VALUE; MULTIOBJECTIVE EVOLUTIONARY ALGORITHMS; GENERAL TEMPORAL CONSTRAINTS; EFFICIENT GENETIC ALGORITHM; PRESENT VALUE OPTIMIZATION; LINEAR-PROGRAMMING MODELS; TIME-COST TRADEOFF; AVAILABILITY COST; HEURISTIC METHODS; DISCRETE-TIME;
D O I
10.1016/j.ejor.2021.05.004
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The resource-constrained project scheduling problem is to schedule activities subject to precedence and resource constraints such that the makespan is minimized. It has become a standard problem in the context of project scheduling which has attracted numerous researchers who developed both exact and heuristic scheduling procedures. However, it is a rather stylized model with assumptions that are too narrow to capture many real world requirements. Consequently, various extensions of the basic resource constrained project scheduling problem have been developed. This paper builds on an overview which was published 10 years ago. Due to the unabated interest in the scientific community since it has been published the overview at hand delivers an update focussing on the last decade. The problem extensions are classified according to the structure of the resource-constrained project scheduling problem. We summarize generalizations of the activity concept, of the precedence relations, and of the resource constraints. Alternative objectives and approaches for scheduling multiple projects are discussed as well. (c) 2021 The Author(s). Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license ( http://creativecommons.org/licenses/by-nc-nd/4.0/ )
引用
收藏
页码:1 / 14
页数:14
相关论文
共 229 条
[1]   Multiobjective model for solving resource-leveling problem with discounted cash flows [J].
Abadi, Niloofar Nikoofal Sahl ;
Bagheri, Mohsen ;
Assadi, Mohammad .
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2018, 25 (06) :2009-2030
[2]   A multi-agent system for decentralized multi-project scheduling with resource transfers [J].
Adhau, Sunil ;
Mittal, M. L. ;
Mittal, Abhinav .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) :646-661
[3]   A multi-agent system for distributed multi-project scheduling: An auction-based negotiation approach [J].
Adhau, Sunil ;
Mittal, M. L. ;
Mittal, Abhinav .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2012, 25 (08) :1738-1751
[4]   A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations [J].
Afruzi, Elham Nabipoor ;
Najafi, Amir Abbas ;
Roghanian, Emad ;
Mazinani, Mostafa .
COMPUTERS & OPERATIONS RESEARCH, 2014, 50 :80-96
[5]  
Afshar-Nadjafi Behrouz, 2018, Applied Computing and Informatics, V14, P192, DOI 10.1016/j.aci.2014.02.003
[6]   Project scheduling for minimizing temporary availability cost of rental resources and tardiness penalty of activities [J].
Afshar-Nadjafi, Behrouz ;
Basati, Mirhossein ;
Maghsoudlou, Hamidreza .
APPLIED SOFT COMPUTING, 2017, 61 :536-548
[7]   Multi-mode resource availability cost problem with recruitment and release dates for resources [J].
Afshar-Nadjafi, Behrouz .
APPLIED MATHEMATICAL MODELLING, 2014, 38 (21-22) :5347-5355
[8]   Resource constrained project scheduling problem with setup times after preemptive processes [J].
Afshar-Nadjafi, Behrouz ;
Majlesi, Mahyar .
COMPUTERS & CHEMICAL ENGINEERING, 2014, 69 :16-25
[9]   A project scheduling approach to production planning with feeding precedence relations [J].
Alfieri, Arianna ;
Tolio, Tullio ;
Urgo, Marcello .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (04) :995-1020
[10]   Modeling frameworks for the multi-skill resource-constrained project scheduling problem: a theoretical and empirical comparison [J].
Almeida, Bernardo F. ;
Correia, Isabel ;
Saldanha-da-Gama, Francisco .
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2019, 26 (03) :946-967