The Planning and Evaluation Method of Power System Reserve Capacity Considering Risk Assessment

被引:0
|
作者
Sun Jibo [1 ]
Wang Yanwei [1 ]
Yang Yinguo [1 ]
Jiang Jiangfeng [2 ]
Liu Fang [2 ]
Kou Yu [2 ]
Bie Zhaohong [2 ]
机构
[1] Guangdong Power Grid Co Ltd, Elect Power Dispatching Control Ctr, Guangzhou 510600, Guangdong, Peoples R China
[2] Xi An Jiao Tong Univ, State Key Lab Elect Insulat & Power Equipment, Xian 710049, Peoples R China
来源
2016 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED) | 2016年
关键词
Reserve capacity planning; Risk assessment; Comprehensive evaluation index; Multi-state generators; SPINNING RESERVE; REQUIREMENTS; PENETRATION;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Reliability and economy both have influence on the reserve capacity planning of power system. Based on the quantitative risk assessment, this paper analyzes the comprehensive evaluation index of power system reserve by the use of equivalent energy function, and then proposes a fast computing method of reserve capacity balancing reliability with economy. Furthermore, considering renewable energy integration has great impact on the reserve planning and a multi-state renewable power modeling is employed. Finally, on the basis of a real-life power system, three kinds of models are simulated and compared to verify the rationality and feasibility of the proposed method.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] An Improved Risk Assessment Considering Spinning Reserve of Power System with Wind Farm Integration
    Zeng, Yuan
    Zhou, Baozhu
    Zhu, Wenfeng
    Qin, Chao
    Zhang, Xin
    Li, Yuanyuan
    Hu, Zhenda
    Lin, Zhangsui
    TENCON 2015 - 2015 IEEE REGION 10 CONFERENCE, 2015,
  • [2] Comprehensive Risk Assessment Method of Power Planning Scheme Considering Natural Disasters
    He, Hailei
    Zhou, Qinyong
    Zuo, Qi
    Zhong, Jun
    2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT 2015), 2015, : 532 - 537
  • [3] Reserve risk assessment method of power system based on total probability risk measure
    Yin J.
    Zhao D.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2020, 40 (01): : 156 - 162
  • [4] Spinning Reserve Capacity Optimization of a Power System When Considering Wind Speed Correlation
    Zhang, Jianglin
    Zhuang, Huimin
    Zhang, Li
    Gao, Jinyu
    APPLIED SYSTEM INNOVATION, 2018, 1 (03) : 1 - 13
  • [5] Risk Assessment of Power Grid Considering the Reliability of the Information System
    Lu, Dongxu
    Liu, Yanli
    Zeng, Yuan
    2016 IEEE INTERNATIONAL CONFERENCE ON SMART GRID COMMUNICATIONS (SMARTGRIDCOMM), 2016,
  • [6] Generation Capacity Expansion Considering Reserve Provision by Wind Power Units
    Canas-Carreton, Miguel
    Carrion, Miguel
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2020, 35 (06) : 4564 - 4573
  • [7] A Risk Assessment Method of Transformer Considering the Economy and Reliability of Power Network
    Lin, Dun
    Xu, Yao-Yu
    Liang, Yu
    Li, Yuan
    Liu, Ning
    Zhang, Guan-Jun
    2017 1ST INTERNATIONAL CONFERENCE ON ELECTRICAL MATERIALS AND POWER EQUIPMENT (ICEMPE), 2017, : 594 - 597
  • [8] Risk Assessment for Power System Operation Planning With High Wind Power Penetration
    Negnevitsky, Michael
    Dinh Hieu Nguyen
    Piekutowski, Marian
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (03) : 1359 - 1368
  • [9] Risk Assessment of Frequency Response and Reserve Requirement for a Power System with High Wind Power Penetration
    Negnevitsky, Michael
    Hieu Nguyen
    Piekutowski, Marian
    PROCEEDINGS OF THE 9TH INTERNATIONAL SCIENTIFIC SYMPOSIUM ON ELECTRICAL POWER ENGINEERING (ELEKTROENERGETIKA 2017), 2017, : 494 - 497
  • [10] Grid planning method considering difference in risk bearing capacity among regional distribution networks
    Xiao B.
    Guo B.
    Ji S.
    Shi Y.
    Jiao M.
    Wang Y.
    Sun D.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2020, 40 (03): : 68 - 75