Study on fault mechanism of LCC-HVDC large disturbances under cloud-to-ground lightning with long continuous current

被引:2
作者
Xiao, Pan [1 ,2 ,3 ]
Li, Peng [1 ,2 ]
Yan, Bo [4 ]
Pu, Ziheng [1 ,2 ]
Wu, Tian [1 ,2 ]
Fang, Chunhua [1 ,2 ]
Wang, Yu [5 ]
机构
[1] China Three Gorges Univ, Coll Elect Engn & New Energy, Yichang, Peoples R China
[2] Hubei Prov Engn Technol Res Ctr Power Transmiss Li, Yichang, Peoples R China
[3] State Grid Anhui Elect Power Co, Tongling Elect Power Co, Tongling, Peoples R China
[4] State Grid Anhui Elect Power Co, Hefei, Peoples R China
[5] Wuhan NARI Ltd Co, State Grid Elect Power Res Inst, Wuhan, Peoples R China
关键词
Lightning; Long continuous current; LCC-HVDC; Commutation failure; Fault restart; Block; COMMUTATION FAILURE; PREVENTION; PROTECTION;
D O I
10.1016/j.epsr.2022.108790
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The safe and stable operation of the line commutated converter high voltage direct current (LCC-HVDC) system is of great significance to the reliability of electricity supply. In order to clearly reveal the mechanism of LCC-HVDC large disturbance fault under the Cloud-to-Ground (C-G) lightning with long continuous current, the HVDC-lightning simulation model considering long continuous current, actual control and protection systems is proposed. The effect of long continuous current on traveling wave protection is analyzed. Transient processes including commutation failure (CF), fault restart and blocking of the DC system under the lighting with long continuous current are simulated. The reasons for CF of LCC-HVDC system caused by long continuous current are analyzed, and the influence of long continuous current amplitude and duration on fault restart process is studied. Results show that the long continuous current has little influence on the response characteristics of travelling wave protection, but during the regulation process of control system under lightning disturbance, the DC current control regulation quantity will increase due to the presence of long continuous current. If the amplitude of long continuous current exceeds 80 A, the CF will occur in the DC system. If the duration of long continuous current exceeds the deionization time, the line will fail to restart, and the line can be successfully restarted only if the long continuous current is over before the voltage begins to rise.
引用
收藏
页数:11
相关论文
共 27 条
  • [1] Decentralized bi-level stochastic optimization approach for multi-agent multi-energy networked micro-grids with multi-energy storage technologies
    Ahmadi, Seyed Ehsan
    Sadeghi, Delnia
    Marzband, Mousa
    Abusorrah, Abdullah
    Sedraoui, Khaled
    [J]. ENERGY, 2022, 245
  • [2] [Anonymous], 1994, Electra, P60
  • [3] [Anonymous], 2010, 623051 IEC
  • [4] Intelligent charging planning for electric vehicle commercial parking lots and its impact on distribution network's imbalance indices
    Baherifard, Mohammad Ali
    Kazemzadeh, Rasool
    Yazdankhah, Ahmad Sadeghi
    Marzband, Mousa
    [J]. SUSTAINABLE ENERGY GRIDS & NETWORKS, 2022, 30
  • [5] [蔡静 Cai Jing], 2019, [电力系统自动化, Automation of Electric Power Systems], V43, P181
  • [6] Modeling of LCC-HVDC Systems Using Dynamic Phasors
    Daryabak, M.
    Filizadeh, S.
    Jatskevich, J.
    Davoudi, A.
    Saeedifard, M.
    Sood, V. K.
    Martinez, J. A.
    Aliprantis, D.
    Cano, J.
    Mehrizi-Sani, A.
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2014, 29 (04) : 1989 - 1998
  • [7] A new proposed dynamic arc model for flashover performance of a non-uniform polluted insulator string under HVAC stress
    El-Zohri, Emad H.
    Ziedan, H.
    Prochazka, R.
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2015, 119 : 278 - 286
  • [8] Study on lightning risk assessment and early warning for UHV DC transmission channel
    Gu, Shanqiang
    Wang, Jian
    Wu, Min
    Guo, Juntian
    Zhao, Chun
    Li, Jian
    [J]. HIGH VOLTAGE, 2019, 4 (02): : 144 - 150
  • [9] [韩平平 Han Pingping], 2021, [电力系统保护与控制, Power System Protection and Control], V49, P25
  • [10] Mechanism and Prevention of Commutation Failure in LCC-HVDC Caused by Sending End AC Faults
    Hong, Lerong
    Zhou, Xiaoping
    Xia, Haitao
    Liu, Yifeng
    Luo, An
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2021, 36 (01) : 473 - 476