A Hybrid Iterated Greedy Algorithm for a Crane Transportation Flexible Job Shop Problem

被引:104
|
作者
Li, Jun-Qing [1 ,2 ]
Du, Yu [1 ]
Gao, Kai-Zhou [3 ]
Duan, Pei-Yong [1 ]
Gong, Dun-Wei [4 ]
Pan, Quan-Ke [5 ]
Suganthan, P. N. [6 ]
机构
[1] Shandong Normal Univ, Sch Informat Sci & Engn, Jinan 250014, Peoples R China
[2] Liaocheng Univ, Sch Comp Sci, Liaocheng 252059, Shandong, Peoples R China
[3] Macau Univ Sci & Technol, Macau Inst Syst Engn, Macau, Peoples R China
[4] China Univ Min & Technol, Sch Informat & Control Engn, Xuzhou 221116, Jiangsu, Peoples R China
[5] Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai 200072, Peoples R China
[6] Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
基金
美国国家科学基金会;
关键词
Cranes; Transportation; Robots; Job shop scheduling; Energy consumption; Poles and towers; Optimization; Crane lift operation; energy consumption; flexible job shop; iterated greedy (IG); simulated annealing (SA); SCHEDULING PROBLEM; FLOW-SHOP; ROBOTIC CELLS; OPTIMIZATION; ENVIRONMENT; MACHINES; MINIMIZE;
D O I
10.1109/TASE.2021.3062979
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this study, we propose an efficient optimization algorithm that is a hybrid of the iterated greedy and simulated annealing algorithms (hereinafter, referred to as IGSA) to solve the flexible job shop scheduling problem with crane transportation processes (CFJSP). Two objectives are simultaneously considered, namely, the minimization of the maximum completion time and the energy consumptions during machine processing and crane transportation. Different from the methods in the literature, crane lift operations have been investigated for the first time to consider the processing time and energy consumptions involved during the crane lift process. The IGSA algorithm is then developed to solve the CFJSPs considered. In the proposed IGSA algorithm, first, each solution is represented by a 2-D vector, where one vector represents the scheduling sequence and the other vector shows the assignment of machines. Subsequently, an improved construction heuristic considering the problem features is proposed, which can decrease the number of replicated insertion positions for the destruction operations. Furthermore, to balance the exploration abilities and time complexity of the proposed algorithm, a problem-specific exploration heuristic is developed. Finally, a set of randomly generated instances based on realistic industrial processes is tested. Through comprehensive computational comparisons and statistical analyses, the highly effective performance of the proposed algorithm is favorably compared against several efficient algorithms.
引用
收藏
页码:2153 / 2170
页数:18
相关论文
共 50 条
  • [21] Improved artificial immune algorithm for the flexible job shop problem with transportation time
    Chen, Xiao-long
    Li, Jun-qing
    Han, Yu-yan
    Sang, Hong-yan
    MEASUREMENT & CONTROL, 2020, 53 (9-10): : 2111 - 2128
  • [22] An integrated greedy heuristic for a flexible job shop scheduling problem
    Mati, Y
    Rezg, N
    Xie, XL
    2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE, 2002, : 2534 - 2539
  • [23] A hybrid harmony search algorithm for the flexible job shop scheduling problem
    Yuan, Yuan
    Xu, Hua
    Yang, Jiadong
    APPLIED SOFT COMPUTING, 2013, 13 (07) : 3259 - 3272
  • [24] Hybrid evolutionary algorithm with insertion heuristics - For the flexible Job Shop Problem
    Neifar, Fredj
    Gzara, Mariem
    Moukrim, Aziz
    Loukil, Taicir
    2006 INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2006, : 1211 - 1216
  • [25] A hybrid and flexible genetic algorithm for the job-shop scheduling problem
    Ferrolho, Antonio
    Crisostomo, Manuel
    2007 INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN ROBOTICS AND AUTOMATION, 2007, : 178 - +
  • [26] A Hybrid Genetic Algorithm for Flexible Job-shop Scheduling Problem
    Wang Shuang-xi
    Zhang Chao-yong
    Jin Liang-liang
    ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES IV, PTS 1 AND 2, 2014, 889-890 : 1179 - 1184
  • [27] Hybrid Bacterial Iterated Greedy Heuristics for the Permutation Flow Shop Problem
    Balazs, Krisztian
    Horvath, Zoltan
    Koczy, Laszlo T.
    2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,
  • [28] Iterated Local Search Algorithm for Flexible Job Shop Scheduling
    Ishigaki, Aya
    Takaki, Shun
    2017 6TH IIAI INTERNATIONAL CONGRESS ON ADVANCED APPLIED INFORMATICS (IIAI-AAI), 2017, : 947 - 952
  • [29] Improved iterated greedy algorithm for reentrant flow shop scheduling problem
    Wu, Xiuli
    Li, Yuxin
    Kuang, Yuan
    Cui, Jianjie
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (07): : 2364 - 2380
  • [30] A hybrid genetic algorithm for multi-objective flexible job shop scheduling problem considering transportation time
    Huang, Xiabao
    Yang, Lixi
    INTERNATIONAL JOURNAL OF INTELLIGENT COMPUTING AND CYBERNETICS, 2019, 12 (02) : 154 - 174