Prioritizing Construction Risks Using Fuzzy AHP in Brazilian Public Enterprises

被引:46
作者
Beltrao, Leandro M. P. [1 ]
Carvalho, Michele T. M. [1 ]
机构
[1] Univ Brasilia, Dept Civil & Environm Engn, Campus Darcy Ribeiro, BR-70910900 Brasilia, DF, Brazil
关键词
DECISION; PROJECTS; MODEL; CORRUPTION; SELECTION; CRITERIA; INDUSTRY; SYSTEM;
D O I
10.1061/(ASCE)CO.1943-7862.0001606
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risks capable of impacting project objectives are intrinsic to the construction industry. Effective risk analysis has key importance to professionals concerned with construction goals, especially in public enterprises, given the amount of money invested and the demand for modern infrastructure. Therefore, this study aims to identify the main public construction risks and present a practical fuzzy analytic hierarchy process (AHP) model to prioritize these risks in Brazilian public enterprises. The model is divided into three steps: (1)risk identification and development of the risk breakdown structure, (2)pairwise comparisons, and (3)risk prioritization. Throughout the case study, 54 risks were identified, which were organized into eight categories. The major risk in the Brazilian scenario was difficulty in environmental licensing. Although this study focused on a specific context, its methodology provides a reliable and practical framework that can be adjusted to various construction projects worldwide to assess risks. Additionally, the identified risks can provide sound guidance to practitioners globally, because their elicitation was based on studies concerning different countries.
引用
收藏
页数:11
相关论文
共 55 条
[1]   Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP [J].
Abdelgawad, Mohamed ;
Fayek, Aminah Robinson .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (09) :1028-1036
[2]  
[Anonymous], 2021, GUID PROJ MAN BOD KN, V7th
[3]  
[Anonymous], 1995, Fuzzy Sets and Fuzzy Logic
[4]  
Azevedo R.C., 2014, MODERN EC, V5, P367
[5]   Scoring Rules and Competitive Behavior in Best-Value Construction Auctions [J].
Ballesteros-Perez, Pablo ;
Skitmore, Martin ;
Pellicer, Eugenio ;
Zhang, Xiaoling .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (09)
[6]   Scoring rules and abnormally low bids criteria in construction tenders: a taxonomic review [J].
Ballesteros-Perez, Pablo ;
Skitmore, Martin ;
Pellicer, Eugenio ;
Carmen Gonzalez-Cruz, M. .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2015, 33 (04) :259-278
[7]   An Analytical Network Process model for risks prioritisation in megaprojects [J].
Boateng, Prince ;
Chen, Zhen ;
Ogunlana, Stephen O. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (08) :1795-1811
[8]   Corruption in the South African construction industry: a thematic analysis of verbatim comments from survey participants [J].
Bowen, Paul Anthony ;
Edwards, Peter J. ;
Cattell, Keith .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2012, 30 (10) :885-901
[9]   Risk assessment of international construction projects using the analytic network process [J].
Bu-Qammaz, Amani Suliman ;
Dikmen, Irem ;
Birgonul, M. Talat .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (07) :1170-1181
[10]   FUZZY HIERARCHICAL ANALYSIS [J].
BUCKLEY, JJ .
FUZZY SETS AND SYSTEMS, 1985, 17 (03) :233-247